Study on the Suitability of Advanced Geological Prediction Methods for TBM Tunnel Construction

被引:0
|
作者
Fu, Wei [1 ]
Zhang, Wenzhong [1 ]
Liu, Zhengyu [2 ]
Zhao, Wen [1 ]
Lu, Song [3 ]
Chen, Xingqiang [1 ]
Wang, Huajiang [1 ]
Cai, Shaofeng [4 ]
机构
[1] China Railway First Survey and Design Institute Group Co. Ltd, Shaanxi, Xi'an,710043, China
[2] Shandong University, Shandong, Jinan,250100, China
[3] China Railway Southwest Research Institute Co. Ltd, Sichuan, Chengdu,500643, China
[4] The General Engineering Survey Institute of Railways of Gansu Co. Ltd, Gansu, Lanzhou,730100, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: In the TBM construction environment, accurate identification of adverse geological bodies in the front tunnel face can effectively avoid geological problems such as machine jam, water and mud inrush. However, due to the extremely narrow space and complex electromagnetic interference of TBM construction, traditional advanced geological prediction methods are difficult to effectively implemented. Based on extensive research, this paper conducted experimental studies on the advantages, disadvantages, and accuracy of different advanced geological prediction methods for TBM construction. The research results have broken through the limitations of traditional single prediction methods and established a comprehensive advanced geological prediction system for TBM construction in extremely complex geological environments. Moreover, this study proposed solutions for advanced geological prediction in complex geological environments such as wide faults and strong water abundance. Research conclusions: (1) The experimental results of groundwater detection under TBM construction conditions show that the induced polarization detection method is more accurate in predicting groundwater bodies. Moreover, this method has good suitability for TBM construction and can effectively solve the problem of groundwater detection in complex hydrogeological environment. (2) The suitability study of elastic wave reflection prediction methods in TBM construction environment shows that HSP and 3D seismic (SAP) methods are highly sensitive to unfavorable geological bodies such as fault fracture zones in extremely complex geological environments. Moreover, these two methods have less interference with tunnel construction and are more suitable for TBM construction environment. (3) The research results of this paper can be used to guide the advance geological prediction design and construction of TBM construction tunnel, and further reduce the construction risk. © 2023 Editorial Department of Journal of Railway Engineering Society. All rights reserved.
引用
收藏
页码:81 / 85
相关论文
共 50 条
  • [41] Advanced Geological Prediction Investigation Based on the Ground Penetrating Radar Method in Qiyueshan Tunnel
    Guo, Ming
    Wu, Jing
    Xu, Zhenhao
    Li, Shucai
    Li, Liping
    Zhou, Lun
    Zhang, Yanhuan
    Chen, Hongbin
    ARCHITECTURAL ENGINEERING AND NEW MATERIALS, 2015, : 526 - 532
  • [42] Research of Advanced Geological Prediction in Tunnel Excavation with Ultra-long Broken Zone
    Xu, Binbin
    2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
  • [43] Prediction models of rock quality designation during TBM tunnel construction using machine learning algorithms
    Hwang, Byeonghyun
    Choi, Hangseok
    Kwon, Kibeom
    Shin, Young Jin
    Kang, Minkyu
    GEOMECHANICS AND ENGINEERING, 2024, 38 (05) : 507 - 515
  • [44] A Study of the Effects of Geological Conditions on Korean Tunnel Construction Time Using the Updated NTNU Drill and Blast Prediction Model
    Kim, Yangkyun
    Lee, Sean Seungwon
    APPLIED SCIENCES-BASEL, 2021, 11 (21):
  • [45] Prediction and classification of rock mass boreability in TBM tunnel
    Wu Xin-lin
    Zhang Xiao-ping
    Liu Quan-sheng
    Li Wei-wei
    Huang Ji-min
    ROCK AND SOIL MECHANICS, 2020, 41 (05) : 1721 - +
  • [46] Combination of geological radar and video surveillance in the tunnel geological prediction
    Liu, Bo
    Li, Ning
    Lv, Gao
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1206 - 1211
  • [47] Case Study of Ground Penetrating Radar for Geological Prediction in Qiyueshan Tunnel
    Zhao, Chenglong
    Li, Shucai
    Wu, Jing
    Xu, Zhenhao
    Zhang, Yanhuan
    Zhou, Lun
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON GREEN MATERIALS AND ENVIRONMENTAL ENGINEERING (GMEE 2015), 2016, 35 : 100 - 103
  • [49] Predicting geological hazards during tunnel construction
    Li, Shucai
    Li, Shuchen
    Zhang, Qingsong
    Xue, Yiguo
    Liu, Bin
    Su, Maoxin
    Wang, Zhechao
    Wang, Shugang
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2010, 2 (03) : 232 - 242
  • [50] GEOLOGICAL INVESTIGATIONS FOR THE CONSTRUCTION OF A TUNNEL IN THE STRAIT OF GIBRALTAR
    ESTERAS, M
    BAHMAD, A
    TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 789 - 796