CONSTRUCTION METHODS AND APPLICATION OF TBM IN SHENGLI TUNNEL OF TIANSHAN MOUNTAIN UNDER POOR GEOLOGICAL CONDITIONS

被引:0
|
作者
Zhao, Zhenping [1 ,2 ]
Chen, Jianxun [3 ]
Geng, Qi [4 ]
Li, Dong [1 ]
Huang, Dengxia [1 ]
Luo, Yanbin [2 ]
Liu, Weiwei [3 ]
Mu, Shaoping [4 ]
Peter Anesu, Kanhenga [4 ]
Wu, Teligen [1 ]
机构
[1] CCCC Cent South Engn Co LTD, Changsha 410114, Hunan, Peoples R China
[2] Southeast Univ, Sch Civil Engn, Nanjing 211189, Jiangsu, Peoples R China
[3] Changan Univ, Highway Sch, Xian 710064, Shaanxi, Peoples R China
[4] Changan Univ, Sch Construct Machinery, Xian 710064, Shaanxi, Peoples R China
来源
关键词
TBM; Poor geology; Geological forecasting; Tunnel face pre-reinforcement; Advanced pipe; shed method;
D O I
10.14311/CEJ.2024.02.0012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When a tunnel boring machine (TBM) excavates in poor geological conditions like fracture zones, soft rock with high ground stress, hard rock with high ground stress, and water inrush ground, severe problems such as surrounding rock collapse, convergence, rock burst and water and mud outburst are usually encountered. These problems existed in the Tianshan Shengli Tunnel project in Xinjiang, China. Several methods and techniques were adopted to reduce the construction risks and improve the construction efficiency. The seismic wave reflection long-distance geological forecasting method was employed to forecast and predict these adverse geological conditions. The prereinforcement construction method was employed on the surrounding broken rocks in front of the tunnel face to lower the risks of tunnel collapse and machine jamming. A combined steel arch was applied to prevent tunnel arch collapse. An artificial cap method was applied to prevent the jamming caused by high-ground stress soft rock. Measures such as spraying water on the tunnel face and drilling stress holes were employed to prevent rock bursts caused by high-ground stress in hard rock. Implementing the advanced pipe shed method during water influx, sudden mud, and other working conditions reduced the risk of groundwater damage to equipment and lowered risks to personnel safety. The successful application of these techniques can provide a reference for TBM tunnel construction in similar ground conditions.
引用
收藏
页码:168 / 180
页数:13
相关论文
共 50 条
  • [1] Study on the Suitability of Advanced Geological Prediction Methods for TBM Tunnel Construction
    Fu, Wei
    Zhang, Wenzhong
    Liu, Zhengyu
    Zhao, Wen
    Lu, Song
    Chen, Xingqiang
    Wang, Huajiang
    Cai, Shaofeng
    Journal of Railway Engineering Society, 2023, 40 (10) : 81 - 85
  • [2] Intrinsically safe in the tunnel construction under complex geological conditions
    Liu, Hui
    Xie, Zhen
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1327 - 1330
  • [3] Stability analysis of TBM tunnel under unfavorable geological conditions of large dip faults
    Wang, Liming
    Meitan Xuebao/Journal of the China Coal Society, 49 : 121 - 128
  • [4] Excavation and Construction Technology of Diversion Tunnel under Complex Geological Conditions
    He, Na
    Zhang, Xianggang
    APPLIED SCIENCES-BASEL, 2023, 13 (20):
  • [5] Analysis of the tunnel construction and monitoring measurement under complicated geological conditions
    Gu, Zhanfei
    Liu, Zhikui
    Chen, Hongchi
    Wang, Yawei
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2091 - +
  • [6] The special geological conditions of mountain tunnel scheme selection
    Sun, LiXia
    Wang, QingBo
    Wang, Dapeng
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1288 - +
  • [7] TBM tunnelling under adverse geological conditions: An overview
    Gong, Qiuming
    Yin, Lijun
    Ma, Hongsu
    Zhao, Jian
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 4 - 17
  • [8] The application of geological advanced prediction in tunnel construction
    Lu Youzhong
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [9] A Study of Tunnel Construction Environment Based on the TBM and Improved Methods
    Wu Qiujun
    Li Ke
    Wang Mingnian
    Chao Feng
    PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON ARCHITECTURAL, CIVIL AND HYDRAULICS ENGINEERING (ICACHE 2016), 2016, 99 : 149 - 153
  • [10] Mechanical Properties of Universal Segmented Tunnel under Different Geological Conditions during Construction
    Zhang, K. P.
    Ma, W. J.
    Jin, Y. Y.
    Xu, P. B.
    ICRT 2021: PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION, 2022, : 313 - 320