CONSTRUCTION METHODS AND APPLICATION OF TBM IN SHENGLI TUNNEL OF TIANSHAN MOUNTAIN UNDER POOR GEOLOGICAL CONDITIONS

被引:0
|
作者
Zhao, Zhenping [1 ,2 ]
Chen, Jianxun [3 ]
Geng, Qi [4 ]
Li, Dong [1 ]
Huang, Dengxia [1 ]
Luo, Yanbin [2 ]
Liu, Weiwei [3 ]
Mu, Shaoping [4 ]
Peter Anesu, Kanhenga [4 ]
Wu, Teligen [1 ]
机构
[1] CCCC Cent South Engn Co LTD, Changsha 410114, Hunan, Peoples R China
[2] Southeast Univ, Sch Civil Engn, Nanjing 211189, Jiangsu, Peoples R China
[3] Changan Univ, Highway Sch, Xian 710064, Shaanxi, Peoples R China
[4] Changan Univ, Sch Construct Machinery, Xian 710064, Shaanxi, Peoples R China
来源
关键词
TBM; Poor geology; Geological forecasting; Tunnel face pre-reinforcement; Advanced pipe; shed method;
D O I
10.14311/CEJ.2024.02.0012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When a tunnel boring machine (TBM) excavates in poor geological conditions like fracture zones, soft rock with high ground stress, hard rock with high ground stress, and water inrush ground, severe problems such as surrounding rock collapse, convergence, rock burst and water and mud outburst are usually encountered. These problems existed in the Tianshan Shengli Tunnel project in Xinjiang, China. Several methods and techniques were adopted to reduce the construction risks and improve the construction efficiency. The seismic wave reflection long-distance geological forecasting method was employed to forecast and predict these adverse geological conditions. The prereinforcement construction method was employed on the surrounding broken rocks in front of the tunnel face to lower the risks of tunnel collapse and machine jamming. A combined steel arch was applied to prevent tunnel arch collapse. An artificial cap method was applied to prevent the jamming caused by high-ground stress soft rock. Measures such as spraying water on the tunnel face and drilling stress holes were employed to prevent rock bursts caused by high-ground stress in hard rock. Implementing the advanced pipe shed method during water influx, sudden mud, and other working conditions reduced the risk of groundwater damage to equipment and lowered risks to personnel safety. The successful application of these techniques can provide a reference for TBM tunnel construction in similar ground conditions.
引用
收藏
页码:168 / 180
页数:13
相关论文
共 50 条
  • [41] DRILLING OF LARGE-DIAMETER WELLS UNDER COMPLEX MOUNTAIN-GEOLOGICAL CONDITIONS
    BLIZNYUKOV, VY
    NEFTYANOE KHOZYAISTVO, 1993, (11): : 13 - 15
  • [42] Application of fuzzy analytic network process in risk analysis for construction of highway mountain tunnel
    Liu, Baoguo
    Shen, Minglong
    Ma, Qiang
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (SUPPL.1): : 2861 - 2869
  • [43] Assessment for shallow and large tunnel construction in weak ground conditions: Application of tunnel boring machines
    Servet Karahan
    Candan Gokceoglu
    Deep Underground Science and Engineering, 2025, 4 (01) : 132 - 148
  • [44] Research on inner force and deformation characteristics of shield tunnel under different geological conditions
    Li, Jie
    Zhang, Qi
    Zhang, Wenjun
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2019, 52 : 69 - 77
  • [45] Numerical study on the mechanical and deformation behavior of a shield tunnel under different geological conditions
    Li, Hui
    Chen, Weizhong
    Wang, Xiaogang
    Tan, Xianjun
    ENGINEERING FAILURE ANALYSIS, 2025, 167
  • [46] Assessment for shallow and large tunnel construction in weak ground conditions: Application of tunnel boring machines
    Karahan, Servet
    Gokceoglu, Candan
    DEEP UNDERGROUND SCIENCE AND ENGINEERING, 2025, 4 (01) : 132 - 148
  • [47] Application of GPR in extra-long tunnel engineering with a variety of adverse geological conditions
    Guo, M.
    Liu, G.
    Bai, T. Y.
    Li, Z. P.
    PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURAL AND HYDRAULIC ENGINEERING (ICCAHE 2016), 2016, 95 : 899 - 905
  • [48] Geological and mechanical rock mass conditions for TBM performance prediction. The case of "La Maddalena" exploratory tunnel, Chiomonte (Italy)
    Armetti, Giacomo
    Migliazza, Maria Rita
    Ferrari, Federica
    Berti, Andrea
    Padovese, Paolo
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 77 : 115 - 126
  • [49] Study on mechanical properties of composite support structures in TBM tunnel under squeezing soft rock conditions
    Lu, Wei
    Song, Shuguang
    Li, Shucai
    Liang, Bingchen
    Li, Jiabin
    Luan, Yingcheng
    Wang, Lei
    Sun, Huibin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 144
  • [50] Ground-tunnel geological prospecting and treatment methods of small-diameter TBM crossing shallow buried water-rich tunnel: A case study
    Nie, Lichao
    Song, Zhicheng
    Li, Zhiqiang
    Zhang, Shilei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 153