Minimize Maximal Regret to Enhance Reliability in Flexible Open-Shop Problem

被引:0
|
作者
Bozzi, Alessandro [1 ,2 ]
Graffione, Simone [1 ]
Sacile, Roberto [1 ]
Zero, Enrico [1 ]
机构
[1] Univ Genoa, Dept Informat Bioengn Robot & Syst Engn DIBRIS, Genoa, Italy
[2] Univ Savoie Mt Blanc, Lab Syst & Mat Mechatron SYMME, Chambery, France
来源
SERVICE ORIENTED, HOLONIC AND MULTI-AGENT MANUFACTURING SYSTEMS FOR INDUSTRY OF THE FUTURE, SOHOMA 2023 | 2024年 / 1136卷
关键词
Flexible manufacturing system; open-shop job scheduling; minimax regret solution; ALGORITHM;
D O I
10.1007/978-3-031-53445-4_16
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Within flexible manufacturing systems, scheduling and routing of products play a crucial role in the production chain. Therefore, it is essential to maintain acceptable performance levels by implementing intelligent product dispatching on machines, especially in the case of delayed processing time due to unforeseen events. This work examines a simplified version of a real production cell to assess whether using a minimax regret cost function can yield a valuable solution for solving the associated flexible open-shop scheduling problem under uncertain processing time. Results from a limited instance indicate the potential of employing this approach when obtaining the optimal solution is computationally demanding due to the existence of numerous alternative paths for products.
引用
收藏
页码:189 / 199
页数:11
相关论文
共 50 条
  • [21] On the open-shop problem with preemption and minimizing the average completion time
    Bräsel, H
    Hennes, H
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 157 (03) : 607 - 619
  • [22] PSO based scheduling algorithm for open-shop scheduling problem
    Department of Industrial and Manufacturing System Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
    Jixie Gongcheng Xuebao, 2006, 2 (129-134):
  • [23] Extended Genetic Algorithm for solving open-shop scheduling problem
    Hosseinabadi, Ali Asghar Rahmani
    Vahidi, Javad
    Saemi, Behzad
    Sangaiah, Arun Kumar
    Elhoseny, Mohamed
    SOFT COMPUTING, 2019, 23 (13) : 5099 - 5116
  • [24] Classical and new heuristics for the open-shop problem: A computational evaluation
    Gueret, C
    Prins, C
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 306 - 314
  • [25] A POLYNOMIAL-TIME OPEN-SHOP PROBLEM WITH AN ARBITRARY NUMBER OF MACHINES
    SEVASTYANOV, SV
    CYBERNETICS AND SYSTEMS ANALYSIS, 1992, 28 (06) : 918 - 933
  • [26] A note on the proof of the complexity of the little-preemptive open-shop problem
    Evgeny V. Shchepin
    Nodari Vakhania
    Annals of Operations Research, 2011, 191 : 251 - 253
  • [27] An Efficient Method for the Open-Shop Scheduling Problem Using Simulated Annealing
    Harmanani, Haidar M.
    Ghosn, Steve Bou
    INFORMATION TECHNOLOGY: NEW GENERATIONS, 2016, 448 : 1183 - 1193
  • [28] A note on the proof of the complexity of the little-preemptive open-shop problem
    Shchepin, Evgeny V.
    Vakhania, Nodari
    ANNALS OF OPERATIONS RESEARCH, 2011, 191 (01) : 251 - 253
  • [29] A heuristic for the two-machine open-shop scheduling problem with transportation times
    Strusevich, VA
    DISCRETE APPLIED MATHEMATICS, 1999, 93 (2-3) : 287 - 304
  • [30] The Improvement of the Total Flow-time Problem of Two Machine Open-shop
    Liu, Lin
    Zhang, Youlin
    Xu, Hongwei
    2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL VII, 2010, : 328 - 331