共 50 条
- [1] A note on the proof of the complexity of the little-preemptive open-shop problem Annals of Operations Research, 2011, 191 : 251 - 253
- [4] On the complexity of constructing multiprocessor little-preemptive schedules Proceedings of the Steklov Institute of Mathematics, 2015, 290 : 166 - 177
- [7] A note on the complexity of the concurrent open shop problem Journal of Scheduling, 2006, 9 : 389 - 396
- [10] Preemptive Open-shop Scheduling: Network Flow based Algorithm DIGITAL DESIGN AND MANUFACTURING TECHNOLOGY II, 2011, 215 : 111 - 114