共 50 条
- [43] An hybrid SA-DATC Approach for JIT Open-Shop Scheduling Problem with Earliness and Tardiness Penalties IFAC PAPERSONLINE, 2019, 52 (13): : 2396 - 2401
- [44] Two-Stage Flow-Open Shop Scheduling Problem to Minimize Makespan INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 527 - 535
- [47] Open Shop Scheduling Problem with a Non-resumable Flexible Maintenance Period COMBINATORIAL OPTIMIZATION AND APPLICATIONS, COCOA 2021, 2021, 13135 : 512 - 526