摘要
Site advance methods for planning and scheduling are essential for effective project management. Typically, construction managers tend to produce schedules based on two constraints: (1) Minimize Project Duration and (2) Allocate Minimum Resources. Moreover, deficits in the cash flow result in reduced profits at the end of the project and delays if financing problems arise, which results in damages (usually additional costs). Traditional scheduling tools like the Critical Path Method (CPM) and Time Constrained Project Scheduling Problem (TCPSP) do not show high efficiency in achieving the required objectives, as scheduling gets complicated. Advanced planning and scheduling methods will be used to produce a feasible schedule that meets specific objectives. This paper proposes amulti-objectivemodel, (1) minimum project duration, (2) resource availability, and (3) minimum cash flow deficit. The model is divided into two modules. The first module produces an optimized, automated schedule achieving the objective of minimum project duration. The second module applies an optimized resource constraint scheduling using user input data of the available resources to allocate the resources on each activity while maintaining the maximum number of resources on site. The model is optimized using an evolutionary algorithm, namely: Genetic Algorithm (GA).
引用
收藏
页码:513 / 522
页数:10
相关论文
共 50 条
  • [41] Entropy-based scheduling of resource-constrained construction projects
    Christodoulou, Symeon
    Ellinas, Georgios
    Aslani, Pooyan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 919 - 928
  • [42] Distributed communication interference resource scheduling using the master-slave parallel scheduling genetic algorithm
    Wei, Zhenhua
    Wu, Wenpeng
    Zhan, Jianwei
    Zhang, Zhaoguang
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [43] A robust genetic algorithm for resource allocation in project scheduling
    Alcaraz, J
    Maroto, C
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 83 - 109
  • [44] A Robust Genetic Algorithm for Resource Allocation in Project Scheduling
    J. Alcaraz
    C. Maroto
    Annals of Operations Research, 2001, 102 : 83 - 109
  • [45] Genetic algorithm for resource leveling problem in project scheduling
    Liu, S.X.
    Wang, M.G.
    2001, Systems Engineering Society of China (21):
  • [46] Resource constraints machine scheduling: A genetic algorithm approach
    Li, YZ
    Wang, F
    Lim, A
    CEC: 2003 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-4, PROCEEDINGS, 2003, : 1080 - 1085
  • [47] Genetic Algorithm for TDRS Communication Scheduling with Resource Constraints
    Li, Zong-li
    Meng, Xin
    Liu, Shu-qian
    Zhang, Sheng-lei
    Zheng, Wei
    2008 INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION WORKSHOP: IITA 2008 WORKSHOPS, PROCEEDINGS, 2008, : 74 - +
  • [48] A Heuristic-Based Genetic Algorithm for Scheduling of Multiple Projects Subjected to Resource Constraints and Environmental Responsibility Commitments
    Shadan Gholizadeh-Tayyar
    Uche Okongwu
    Jacques Lamothe
    Process Integration and Optimization for Sustainability, 2021, 5 : 361 - 382
  • [49] Blower resource scheduling based on elite genetic algorithm
    Nian, Yang Guang
    Wei, Qi
    Jun, Zhou
    ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 591 - +
  • [50] Dynamic Resource Scheduling Based on Improved Genetic Algorithm
    Gui Yuanyuan
    2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 1972 - 1977