共 50 条
- [42] Distributed communication interference resource scheduling using the master-slave parallel scheduling genetic algorithm SCIENTIFIC REPORTS, 2025, 15 (01):
- [44] A Robust Genetic Algorithm for Resource Allocation in Project Scheduling Annals of Operations Research, 2001, 102 : 83 - 109
- [45] Genetic algorithm for resource leveling problem in project scheduling 2001, Systems Engineering Society of China (21):
- [46] Resource constraints machine scheduling: A genetic algorithm approach CEC: 2003 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-4, PROCEEDINGS, 2003, : 1080 - 1085
- [47] Genetic Algorithm for TDRS Communication Scheduling with Resource Constraints 2008 INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION WORKSHOP: IITA 2008 WORKSHOPS, PROCEEDINGS, 2008, : 74 - +
- [48] A Heuristic-Based Genetic Algorithm for Scheduling of Multiple Projects Subjected to Resource Constraints and Environmental Responsibility Commitments Process Integration and Optimization for Sustainability, 2021, 5 : 361 - 382
- [49] Blower resource scheduling based on elite genetic algorithm ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 591 - +
- [50] Dynamic Resource Scheduling Based on Improved Genetic Algorithm 2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 1972 - 1977