Genetic Algorithm for TDRS Communication Scheduling with Resource Constraints

被引:3
|
作者
Li, Zong-li [1 ,2 ,3 ]
Meng, Xin [1 ]
Liu, Shu-qian
Zhang, Sheng-lei [4 ]
Zheng, Wei [1 ,2 ]
机构
[1] Chinese Acad Sci, Ctr Space Sci & Appl Res, Beijing 100190, Peoples R China
[2] Grad Univ Chinese Acad Sci, Beijing 100049, Peoples R China
[3] Taiyuan Satellite Launch Ctr, Taiyuan 030027, Peoples R China
[4] Beijing Aerosp Command Control Ctr, Beijing 100094, Peoples R China
关键词
D O I
10.1109/IITA.Workshops.2008.85
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The focus of this paper is dynamic link allocation algorithms for sharing the limited link resources of the Tracking and Data Relay satellites (TDRS) system among many burst users with varying Quality of Service (QoS) requirements. The task of scheduling communications between TDRS link and spacecraft is getting more and more critical since an increasing number of spacecraft must communicate with ground station by the TDRS. In such a congested scenario, the current practice, in which experts build hand-made schedules, often leaves a large number of communication requests un-served This paper proposes a light time-indexed formulation of the problem to include several complex technological constraints. A genetic algorithm is then devised which provides near-optimal solutions of a set of large-scale test problems arising in the TDRS-Spacecraft constellation. As the simulation result, the genetic algorithm shows numerical stability and robustness adequate for practical implementation.
引用
收藏
页码:74 / +
页数:2
相关论文
共 50 条
  • [1] Resource constraints machine scheduling: A genetic algorithm approach
    Li, YZ
    Wang, F
    Lim, A
    CEC: 2003 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-4, PROCEEDINGS, 2003, : 1080 - 1085
  • [2] Project Scheduling with Resource Constraints by Fuzzy Gantt Chart and Genetic Algorithm
    Tsai, Shang-En
    JOURNAL OF AERONAUTICS ASTRONAUTICS AND AVIATION, 2019, 51 (04): : 391 - 402
  • [3] Product Scheduling Optimization under Resource Constraints based on Improved Genetic Algorithm
    Liu, Hang
    Jia, Wen
    Zhang, Ruijia
    PROCEEDINGS OF 2024 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE AND DIGITAL APPLICATIONS, MIDA2024, 2024, : 392 - 400
  • [4] Product Scheduling Optimization under Resource Constraints Based on Improved Genetic Algorithm
    Liu, Hang
    Jia, Wen
    Zhang, Ruijia
    ACM International Conference Proceeding Series, : 392 - 400
  • [5] Application of Genetic Algorithm and Fuzzy Gantt Chart to Project Scheduling with Resource Constraints
    Liu, Yu-Chuan
    Gao, Hong-Mei
    Yang, Shih-Ming
    Chuang, Chun-Yung
    INTELLIGENT COMPUTING METHODOLOGIES, 2014, 8589 : 241 - 252
  • [6] A self-adapting genetic algorithm for project scheduling under resource constraints
    Hartmann, S
    NAVAL RESEARCH LOGISTICS, 2002, 49 (05) : 433 - 448
  • [7] A genetic algorithm for realistic resource scheduling
    Beck, FL
    Thomalla, CS
    2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 2522 - 2527
  • [8] An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
    Lova, Antonio
    Tormos, Pilar
    Cervantes, Mariamar
    Barber, Federico
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 117 (02) : 302 - 316
  • [9] Scheduling multi-processor tasks with resource and timing constraints using genetic algorithm
    Cheng, SC
    Huang, YM
    2003 IEEE INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN ROBOTICS AND AUTOMATION, VOLS I-III, PROCEEDINGS, 2003, : 624 - 629
  • [10] Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
    Chen, Po-Han
    Shahandashti, Seyed Mohsen
    AUTOMATION IN CONSTRUCTION, 2009, 18 (04) : 434 - 443