Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm

被引:0
|
作者
Kong, Jili [1 ]
Yang, Yi [1 ]
机构
[1] Beijing Univ Posts & Telecommun, Sch Modern Post, Sch Automat, Beijing 100876, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 10期
关键词
flexible job shop scheduling; multi-equipment work center; machine setup and job handling; multi-objective optimization; improved shuffled frog leaping algorithm; OPTIMIZATION; SEARCH;
D O I
10.3390/app14104029
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Flexible job shop scheduling problem (FJSP), widely prevalent in many intelligent manufacturing industries, is one of the most classic problems of production scheduling and combinatorial optimization. In actual manufacturing enterprises, the setup of machines and the handling of jobs have an important impact on the scheduling plan. Furthermore, there is a trend for a cluster of machines with similar functionalities to form a work center. Considering the above constraints, a new order-driven multi-equipment work center FJSP model with setup and handling including multiple objectives encompassing the minimization of the makespan, the number of machine shutdowns, and the number of handling batches is established. An improved shuffled frog leading algorithm is designed to solve it through the optimization of the initial solution population, the improvement of evolutionary operations, and the incorporation of Pareto sorting. The algorithm also combines the speed calculation method in the gravity search algorithm to enhance the stability of the solution search. Some standard FJSP data benchmarks have been selected to evaluate the effectiveness of the algorithm, and the experimental results confirm the satisfactory performance of the proposed algorithm. Finally, a problem example is designed to demonstrate the algorithm's capability to generate an excellent scheduling plan.
引用
收藏
页数:27
相关论文
共 50 条
  • [41] Immune Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Ren, Huizhi
    Xu, Han
    Sun, Shenshen
    PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 2167 - 2171
  • [42] An effective hybrid algorithm for multi-objective flexible job-shop scheduling problem
    Huang, Xiabao
    Guan, Zailin
    Yang, Lixi
    ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (09):
  • [43] Multi-objective evolutionary algorithm to solve interval flexible job shop scheduling problem
    Wang C.
    Wang Y.
    Ji Z.-C.
    Kongzhi yu Juece/Control and Decision, 2019, 34 (05): : 908 - 916
  • [44] An improved multi-objective evolutionary algorithm based on decomposition for bi-objective fuzzy flexible job-shop scheduling problem
    Li R.
    Gong W.-Y.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2022, 39 (01): : 31 - 40
  • [45] Flexible Job Shop Scheduling Multi-objective Optimization Based on Improved Strength Pareto Evolutionary Algorithm
    Wei, Wei
    Feng, Yixiong
    Tan, Jianrong
    Hagiwara, Ichiro
    NEW TRENDS AND APPLICATIONS OF COMPUTER-AIDED MATERIAL AND ENGINEERING, 2011, 186 : 546 - +
  • [46] A Combination of Shuffled Frog Leaping and Fuzzy Logic for Flexible Job-Shop Scheduling Problems
    Teekeng, Wannaporn
    Thammano, Arit
    COMPLEX ADAPTIVE SYSTEMS, 2011, 6
  • [47] A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem
    Miguel A. Fernández Pérez
    Fernanda M. P. Raupp
    Journal of Intelligent Manufacturing, 2016, 27 : 409 - 416
  • [48] Multi-objective dynamic scheduling algorithm for flexible job-shop problem based on rule orientation
    Zhu W.
    Zhu, Wei (314560255@qq.com), 1600, Systems Engineering Society of China (37): : 2690 - 2699
  • [49] A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem
    Fernandez Perez, Miguel A.
    Raupp, Fernanda M. P.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (02) : 409 - 416
  • [50] A Tabu Search-based Memetic Algorithm for the Multi-objective Flexible Job Shop Scheduling Problem
    Kefalas, Marios
    Limmer, Steffen
    Apostolidis, Asteris
    Olhofer, Markus
    Emmerich, Michael
    Back, Thomas
    PROCEEDINGS OF THE 2019 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE COMPANION (GECCCO'19 COMPANION), 2019, : 1254 - 1262