Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm

被引:0
|
作者
Kong, Jili [1 ]
Yang, Yi [1 ]
机构
[1] Beijing Univ Posts & Telecommun, Sch Modern Post, Sch Automat, Beijing 100876, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 10期
关键词
flexible job shop scheduling; multi-equipment work center; machine setup and job handling; multi-objective optimization; improved shuffled frog leaping algorithm; OPTIMIZATION; SEARCH;
D O I
10.3390/app14104029
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Flexible job shop scheduling problem (FJSP), widely prevalent in many intelligent manufacturing industries, is one of the most classic problems of production scheduling and combinatorial optimization. In actual manufacturing enterprises, the setup of machines and the handling of jobs have an important impact on the scheduling plan. Furthermore, there is a trend for a cluster of machines with similar functionalities to form a work center. Considering the above constraints, a new order-driven multi-equipment work center FJSP model with setup and handling including multiple objectives encompassing the minimization of the makespan, the number of machine shutdowns, and the number of handling batches is established. An improved shuffled frog leading algorithm is designed to solve it through the optimization of the initial solution population, the improvement of evolutionary operations, and the incorporation of Pareto sorting. The algorithm also combines the speed calculation method in the gravity search algorithm to enhance the stability of the solution search. Some standard FJSP data benchmarks have been selected to evaluate the effectiveness of the algorithm, and the experimental results confirm the satisfactory performance of the proposed algorithm. Finally, a problem example is designed to demonstrate the algorithm's capability to generate an excellent scheduling plan.
引用
收藏
页数:27
相关论文
共 50 条
  • [31] IMPROVED BACTERIA FORAGING OPTIMIZATION ALGORITHM FOR MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM
    Ning, Tao
    Guo, Chen
    Chen, Rong
    Jin, Hua
    JOURNAL OF INVESTIGATIVE MEDICINE, 2015, 63 (08) : S34 - S34
  • [32] Improved NSGA2 Algorithm to Solve Multi-Objective Flexible Job Shop Scheduling Problem
    Liang, Xu
    Liu, Yifan
    Huang, Ming
    2020 IEEE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2020, : 22 - 25
  • [33] A Pareto based discrete Jaya algorithm for multi-objective flexible job shop scheduling problem
    Caldeira, Rylan H.
    Gnanavelbabu, A.
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 170
  • [34] A New MCTS-Based Algorithm for Multi-Objective Flexible Job Shop Scheduling Problem
    Chou, Jen-Jai
    Liang, Chao-Chin
    Wu, Hung-Chun
    Wu, I-Chen
    Wu, Tung-Ying
    2015 CONFERENCE ON TECHNOLOGIES AND APPLICATIONS OF ARTIFICIAL INTELLIGENCE (TAAI), 2015, : 136 - 141
  • [35] Improved PSO algorithm for multi-objective optimization flexible job shop scheduling problems
    Bai, Junjie
    Wang, Ningsheng
    Tang, Dunbing
    Nanjing Hangkong Hangtian Daxue Xuebao/Journal of Nanjing University of Aeronautics and Astronautics, 2010, 42 (04): : 447 - 453
  • [36] Flow Shop Scheduling Problem with Limited Buffer Based on Hybrid Shuffled Frog Leaping Algorithm
    Liang, Xu
    Wang, Peixuan
    Huang, Ming
    PROCEEDINGS OF 2019 IEEE 7TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT 2019), 2019, : 87 - 93
  • [37] A hybrid algorithm for multi-objective job shop scheduling problem
    Li, Junqing
    Pan, Quanke
    Xie, Shengxian
    Gao, Kaizhou
    Wang, Yuting
    2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3630 - 3634
  • [38] An estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem
    Wang, Shengyao
    Wang, Ling
    Liu, Min
    Xu, Ye
    PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING (CISCHED), 2013, : 1 - 8
  • [39] A multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Gao, Liang
    Zhang, Chaoyong
    Li, Xinyu
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2012, 45 (2-3) : 115 - 125
  • [40] Multi-objective flexible job shop scheduling problem using differential evolution algorithm
    Cao, Yang
    Shi, Haibo
    Han, Zhonghua
    2017 9TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC 2017), 2017, : 521 - 526