Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm

被引:0
|
作者
Kong, Jili [1 ]
Yang, Yi [1 ]
机构
[1] Beijing Univ Posts & Telecommun, Sch Modern Post, Sch Automat, Beijing 100876, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 10期
关键词
flexible job shop scheduling; multi-equipment work center; machine setup and job handling; multi-objective optimization; improved shuffled frog leaping algorithm; OPTIMIZATION; SEARCH;
D O I
10.3390/app14104029
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Flexible job shop scheduling problem (FJSP), widely prevalent in many intelligent manufacturing industries, is one of the most classic problems of production scheduling and combinatorial optimization. In actual manufacturing enterprises, the setup of machines and the handling of jobs have an important impact on the scheduling plan. Furthermore, there is a trend for a cluster of machines with similar functionalities to form a work center. Considering the above constraints, a new order-driven multi-equipment work center FJSP model with setup and handling including multiple objectives encompassing the minimization of the makespan, the number of machine shutdowns, and the number of handling batches is established. An improved shuffled frog leading algorithm is designed to solve it through the optimization of the initial solution population, the improvement of evolutionary operations, and the incorporation of Pareto sorting. The algorithm also combines the speed calculation method in the gravity search algorithm to enhance the stability of the solution search. Some standard FJSP data benchmarks have been selected to evaluate the effectiveness of the algorithm, and the experimental results confirm the satisfactory performance of the proposed algorithm. Finally, a problem example is designed to demonstrate the algorithm's capability to generate an excellent scheduling plan.
引用
收藏
页数:27
相关论文
共 50 条
  • [21] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem
    Alireza Rahimi-Vahed
    Mostafa Dangchi
    Hamed Rafiei
    Ehsan Salimi
    The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1227 - 1239
  • [22] Shuffled frog leaping algorithm approach to employee timetabling and job shop scheduling
    Ramya, G.
    Chandrasekaran, M.
    International Journal of Internet Manufacturing and Services, 2014, 3 (03) : 178 - 203
  • [23] A Collaborative Evolutionary Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Li, X. Y.
    Gao, L.
    2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 997 - 1002
  • [24] A Novel Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling with Interval Processing Time
    Lei, Deming
    Cao, Sanqiang
    PROCEEDINGS OF THE 36TH CHINESE CONTROL CONFERENCE (CCC 2017), 2017, : 2708 - 2713
  • [25] Application of multi-objective memetic algorithm in multi-objective flexible job-shop scheduling problem
    Zhenwen, H.U.
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 24 - 28
  • [26] A cloud based improved method for multi-objective flexible job-shop scheduling problem
    Ning, Tao
    Jin, Hua
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (01) : 823 - 829
  • [27] An Improved Multi-Objective Hybrid Algorithm for Solving Job Shop Scheduling Problem
    Patrascu, Aurelia
    Toader, Florentina Alina
    Balacescu, Aniela
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2024, 58 (03): : 177 - 192
  • [28] An improved multi-objective optimization algorithm for solving flexible job shop scheduling problem with variable batches
    WU Xiuli
    PENG Junjian
    XIE Zirun
    ZHAO Ning
    WU Shaomin
    Journal of Systems Engineering and Electronics, 2021, 32 (02) : 272 - 285
  • [29] An improved multi-objective optimization algorithm for solving flexible job shop scheduling problem with variable batches
    Wu Xiuli
    Peng Junjian
    Xie Zirun
    Zhao Ning
    Wu Shaomin
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2021, 32 (02) : 272 - 285
  • [30] Solving multi-objective green flexible job shop scheduling problem by an improved chimp optimization algorithm
    Luan F.
    Tang B.
    Li Y.
    Liu S.Q.
    Yang X.
    Masoud M.
    Feng B.
    Journal of Intelligent and Fuzzy Systems, 2024, 46 (04): : 7697 - 7710