Research on Multi-Objective Flexible Job Shop Scheduling Problem with Setup and Handling Based on an Improved Shuffled Frog Leaping Algorithm

被引:0
|
作者
Kong, Jili [1 ]
Yang, Yi [1 ]
机构
[1] Beijing Univ Posts & Telecommun, Sch Modern Post, Sch Automat, Beijing 100876, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 10期
关键词
flexible job shop scheduling; multi-equipment work center; machine setup and job handling; multi-objective optimization; improved shuffled frog leaping algorithm; OPTIMIZATION; SEARCH;
D O I
10.3390/app14104029
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Flexible job shop scheduling problem (FJSP), widely prevalent in many intelligent manufacturing industries, is one of the most classic problems of production scheduling and combinatorial optimization. In actual manufacturing enterprises, the setup of machines and the handling of jobs have an important impact on the scheduling plan. Furthermore, there is a trend for a cluster of machines with similar functionalities to form a work center. Considering the above constraints, a new order-driven multi-equipment work center FJSP model with setup and handling including multiple objectives encompassing the minimization of the makespan, the number of machine shutdowns, and the number of handling batches is established. An improved shuffled frog leading algorithm is designed to solve it through the optimization of the initial solution population, the improvement of evolutionary operations, and the incorporation of Pareto sorting. The algorithm also combines the speed calculation method in the gravity search algorithm to enhance the stability of the solution search. Some standard FJSP data benchmarks have been selected to evaluate the effectiveness of the algorithm, and the experimental results confirm the satisfactory performance of the proposed algorithm. Finally, a problem example is designed to demonstrate the algorithm's capability to generate an excellent scheduling plan.
引用
收藏
页数:27
相关论文
共 50 条
  • [1] An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems
    Li, Junqing
    Pan, Quanke
    Xie, Shengxian
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (18) : 9353 - 9371
  • [2] An Improved Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling Problem
    Kong Lu
    Li Ting
    Wang Keming
    Zhu Hanbing
    Makoto, Takano
    Yu Bin
    ALGORITHMS, 2015, 8 (01) : 19 - 31
  • [3] Improved Shuffled Frog Leaping Algorithm for Multi-objection Flexible Job-Shop Scheduling Problem
    Gou, Mingli
    Gao, Qingxuan
    Yang, Su
    INTELLIGENT COMPUTING AND INTERNET OF THINGS, PT II, 2018, 924 : 3 - 14
  • [4] An Effective Shuffled Frog-leaping Algorithm for the Flexible Job-shop Scheduling Problem
    Xu, Ye
    Wang, Ling
    Wang, Shengyao
    PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN CONTROL AND AUTOMATION (CICA), 2013, : 128 - 134
  • [5] The Improved Genetic Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Yang, Jian Jun
    Ju, Lu Yan
    Liu, Bao Ye
    MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 870 - 875
  • [6] An improved shuffled frog leaping algorithm on multi-objective parallel machine batch scheduling
    Guo, Guangmiao
    Wan, Lili
    Gao, Xiaoyu
    2018 CHINESE AUTOMATION CONGRESS (CAC), 2018, : 2033 - 2037
  • [7] Hybrid Shuffled Frog-leaping Algorithm for Distributed Flexible Job Shop Scheduling
    Meng, Leilei
    Zhang, Biao
    Ren, Yaping
    Zhang, Chaoyong
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2021, 57 (17): : 263 - 272
  • [8] Flexible Job Shop Scheduling Problem Based on Multi-Objective Optimization Algorithm
    Zhang, Li
    Wang, Lu
    PROCEEDINGS OF THE 2018 INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC, CONTROL AND AUTOMATION ENGINEERING (MECAE 2018), 2018, 149 : 580 - 588
  • [9] An Improved Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Zhang, Chaoyong
    Wang, Xiaojuan
    Gao, Liang
    MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2449 - 2454
  • [10] An Improved Ant Colony Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Li, Li
    Wang, Keqi
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 697 - +