Design and construction process of the plumbing renovation works in the case of a super high-rise condominium

被引:0
|
作者
UJI Y. [1 ]
AKIYAMA T. [1 ]
机构
[1] Toyo Univ., Japan
关键词
Contingency fund; Design and construction process; Plumbing renovation work; Project delivery methods; Super high-rise condominium;
D O I
10.3130/aijt.26.1190
中图分类号
学科分类号
摘要
The author conducted a fact-finding survey on the design and construction process of plumbing renovation works with the case from a super high-rise condominium. This research aims to reveal 1) Consensus-building process on the renovation works at the condominium associations 2) Project delivery methods and their challenges in the design development stage and 3) Challenges in the construction stage. Among the significant factors for the successful renovation works lies the consensus-building processes developed beforehand by the condominium associations. Construction execution plans considering the elevator operating ratio or the cost on the residents' burden should be among future topics of discussion. © 2020 Architectural Institute of Japan. All rights reserved.
引用
收藏
页码:1190 / 1195
页数:5
相关论文
共 50 条
  • [21] Pump noise and vibration mitigation in high-rise residential condominium
    JEAcoustics/Engineered Vibration Acoustic and Noise Solutions, 1705 West Koenig Lane, Austin, TX 78756, United States
    Int. Congr. Sound Vib., ICSV, (2060-2067):
  • [22] Impact of High-Rise Buildings Construction Process on Adjacent Tunnels
    Guo, Haifeng
    Yao, Aijun
    Zhang, Jiantao
    Zhou, Yijun
    Guo, Yanfei
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [23] Influence of shrinkage and creep on high-rise building in construction process
    Deng, Zhi-Heng
    Qin, Rong
    Harbin Jianzhu Daxue Xuebao/Journal of Harbin University of Civil Engineering and Architecture, 2002, 35 (05): : 28 - 31
  • [24] Energy-efficient renovation of high-rise housing
    Gorgolewski, M
    Grindley, PC
    Probert, SD
    APPLIED ENERGY, 1996, 53 (04) : 365 - 382
  • [25] Fire safety issues in the design and construction of high-rise buildings
    Poliakova, Tatiana
    Grigoryan, Marina
    XXVII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (27RSP) (TFOCE 2018), 2018, 196
  • [26] Progress in Study of Concrete Pumping Construction Techniques in Super High-rise Building
    Ba, Ling-Zhen
    Yang, Yi-Bo
    Liang, Song
    Mo, Hai-Hong
    Cao, Hong
    Liu, Ting-Jin
    Chen, Jun-Sheng
    ULTRA-HIGH-PUMPABILITY AND HIGH PERFORMANCE CONCRETE TECHNOLOGY, 2009, 405-406 : 110 - 116
  • [27] Research of vertical deformation and predeformation of super high-rise buildings during construction
    Wang, H.-J. (huajie_wang@163.com), 1600, Tsinghua University (30):
  • [28] Progress in study of concrete pumping construction techniques in super high-rise building
    South China University of Technology, Guangzhou, Guangdong, 510640, China
    不详
    Key Eng Mat, 2009, (110-116):
  • [29] Structural selection and design analysis of a super high-rise office building
    Zhang, Xiaomeng
    Liu, Wenting
    Li, Yongxin
    Yang, Songlin
    Liu, Xiang
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [30] Design and optimization of the pipe fixed supports in the super high-rise building
    Huang, Ye
    Wang, Hehui
    Hu, Xinyu
    Li, Yan
    Wang, Zhihua
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND TRANSPORTATION 2015, 2016, 30 : 783 - 787