Design and construction process of the plumbing renovation works in the case of a super high-rise condominium

被引:0
|
作者
UJI Y. [1 ]
AKIYAMA T. [1 ]
机构
[1] Toyo Univ., Japan
关键词
Contingency fund; Design and construction process; Plumbing renovation work; Project delivery methods; Super high-rise condominium;
D O I
10.3130/aijt.26.1190
中图分类号
学科分类号
摘要
The author conducted a fact-finding survey on the design and construction process of plumbing renovation works with the case from a super high-rise condominium. This research aims to reveal 1) Consensus-building process on the renovation works at the condominium associations 2) Project delivery methods and their challenges in the design development stage and 3) Challenges in the construction stage. Among the significant factors for the successful renovation works lies the consensus-building processes developed beforehand by the condominium associations. Construction execution plans considering the elevator operating ratio or the cost on the residents' burden should be among future topics of discussion. © 2020 Architectural Institute of Japan. All rights reserved.
引用
收藏
页码:1190 / 1195
页数:5
相关论文
共 50 条
  • [11] DESIGNING PLUMBING SYSTEMS FOR HIGH-RISE FACILITIES.
    Sabrsula, Larry
    Consulting-Specifying Engineer, 1988, 3 (02) : 44 - 51
  • [12] Design and Improvement of foundation soil for high-rise construction
    Fahmi, Kwa Sally
    Fattah, Mohammed Y.
    Pustovgar, Andrey
    INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2017 BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2018, 170
  • [13] The Design of Super High-Rise Building Fire: Case Study of Guangzhou West Tower
    Liu, Zhenxing
    Wang, Yaowu
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 308 - 311
  • [14] High-rise manual: Typology and design, construction and technology
    Winter, J
    ARCHITECTURAL REVIEW, 2004, 215 (1286) : 96 - 96
  • [15] Analysis of medium earthquake design for super high-rise buildings
    Ling, Huang
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON ADVANCED DESIGN AND MANUFACTURING ENGINEERING, 2015, 39 : 1345 - 1349
  • [16] Bayesian model updating of super high-rise building for construction simulation
    Du, Ya-Nan
    Qin, Zhi-Chuan
    Guan, Cong-Cong
    Feng, De-Cheng
    Wu, Gang
    STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 2024, 33 (10):
  • [17] Modern Technologies of Geodetic Support of Planning Works in High-Rise Construction
    Novomlynets, Oleh
    Tereshchuk, Oleksiy
    Kriachok, Sergiy
    Belenok, Vadym
    Sharyi, Hryhorii
    Gladilin, Valeriy
    GEODETSKI LIST, 2022, 76 (01) : 71 - 86
  • [18] Research on the Difficulties and Countermeasures of Super High-rise Steel Structure Construction
    Yin, Yong
    Zeng, Hong
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [19] Fire protection design of super high-rise elevated Heliport
    Li DaShuai
    Zhang Xu
    2020 5TH INTERNATIONAL CONFERENCE ON ELECTROMECHANICAL CONTROL TECHNOLOGY AND TRANSPORTATION (ICECTT 2020), 2020, : 440 - 443
  • [20] Structural design of a super high-rise apartment with shearwall structure
    Wang, Hao
    Xiao, Qing
    Yu, Nan
    Lü, Ang
    Cheng, Shifeng
    Liu, Hongtao
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2009, 30 (SUPPL. 1): : 64 - 68