Considering time and space in drilling and completion can reduce well interference

被引:0
|
作者
Feder J.
机构
来源
JPT, Journal of Petroleum Technology | 2019年 / 71卷 / 09期
关键词
Well completion - Shale - Oil wells - Hydraulic fracturing - Well spacing - Infill drilling;
D O I
10.2118/0919-0078-JPT
中图分类号
学科分类号
摘要
Development of organic shale reservoirs with large hydraulic- fracture treatments not only poses challenges to the completion of a single well, but also to interference with surrounding wells. A direct consequence of interference is production loss. Therefore, the drilling and completion schedule for field development must be 4D in time and space to account for interaction in between wells. The complete paper describes a physics-based model of interference and a sensitivity study to propose guidelines for well spacing and a drilling timeline for multiple horizontal wells in the Vaca Muerta shale. © 2019 Society of Petroleum Engineers. All rights reserved.
引用
收藏
页码:78 / 80
页数:2
相关论文
共 50 条
  • [41] Research and application on wellbore integrity technology for Integration of Oil Recovery, Well Completion and Drilling
    Bai, Xuemin
    Yang, Song
    Yuan, Xizhi
    Xie, Jiang
    Li, Weijie
    5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, 2019, 358
  • [42] Formate Drilling and Completion Fluids: Evaluation of Potential Well-Productivity Impact, Valemon
    Fleming, N.
    Moland, L. G.
    Svanes, G.
    Watson, R.
    Green, J.
    Patey, I.
    Byrne, M.
    Howard, S.
    SPE PRODUCTION & OPERATIONS, 2016, 31 (01): : 22 - 28
  • [43] Drilling and logging in space; an oil-well perspective.
    Peeters, M
    Blair, B
    SPACE 2000, PROCEEDINGS, 2000, : 739 - 747
  • [44] SMART: Speedup Job Completion Time by Scheduling Reduce Tasks
    Dong, Jia-Qing
    He, Ze-Hao
    Gong, Yuan-Yuan
    Yu, Pei-Wen
    Tian, Chen
    Dou, Wan-Chun
    Chen, Gui-Hai
    Xia, Nai
    Guan, Hao-Ran
    JOURNAL OF COMPUTER SCIENCE AND TECHNOLOGY, 2022, 37 (04) : 763 - 778
  • [45] SMART: Speedup Job Completion Time by Scheduling Reduce Tasks
    Jia-Qing Dong
    Ze-Hao He
    Yuan-Yuan Gong
    Pei-Wen Yu
    Chen Tian
    Wan-Chun Dou
    Gui-Hai Chen
    Nai Xia
    Hao-Ran Guan
    Journal of Computer Science and Technology, 2022, 37 : 763 - 778
  • [46] Reduce Completion Time and Guarantee Throughput by Transport with Slight Congestion
    Zhao, Zongyi
    Li, Qing
    Xu, Mingwei
    Shi, Xingang
    Zhang, Han
    2016 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2016,
  • [47] Remote real-time well monitoring and model updating help optimize drilling performance and reduce casing strings
    Goobie, Roger B.
    Tollefsen, Ed
    Noeth, Sheila
    Sayers, Colin
    den Boer, Lennert
    Hooyman, Pat
    Akinniranye, Goke
    Cooke, Jay
    Thomas, Ron
    Carter, Edgar
    SPE DRILLING & COMPLETION, 2008, 23 (03) : 242 - 249
  • [48] Drilling optimization and use of a titanium motor reduce short-radius-drilling time
    不详
    JOURNAL OF PETROLEUM TECHNOLOGY, 1998, 50 (09): : 52 - 53
  • [49] PREDATION IN TIME AND SPACE - DRILLING IN THE GASTROPOD TURRITELLA
    DUDLEY, EC
    VERMEIJ, GJ
    PALEOBIOLOGY, 1978, 4 (04) : 436 - 441
  • [50] How Well Can Graphs Represent Wireless Interference?
    Halldorsson, Magnus M.
    Tonoyan, Tigran
    STOC'15: PROCEEDINGS OF THE 2015 ACM SYMPOSIUM ON THEORY OF COMPUTING, 2015, : 635 - 644