Considering time and space in drilling and completion can reduce well interference

被引:0
|
作者
Feder J.
机构
来源
JPT, Journal of Petroleum Technology | 2019年 / 71卷 / 09期
关键词
Well completion - Shale - Oil wells - Hydraulic fracturing - Well spacing - Infill drilling;
D O I
10.2118/0919-0078-JPT
中图分类号
学科分类号
摘要
Development of organic shale reservoirs with large hydraulic- fracture treatments not only poses challenges to the completion of a single well, but also to interference with surrounding wells. A direct consequence of interference is production loss. Therefore, the drilling and completion schedule for field development must be 4D in time and space to account for interaction in between wells. The complete paper describes a physics-based model of interference and a sensitivity study to propose guidelines for well spacing and a drilling timeline for multiple horizontal wells in the Vaca Muerta shale. © 2019 Society of Petroleum Engineers. All rights reserved.
引用
收藏
页码:78 / 80
页数:2
相关论文
共 50 条
  • [31] DEEP WELL PLANNING CAN MINIMIZE DRILLING PROBLEMS
    EATON, BA
    WORLD OIL, 1972, 174 (07) : 59 - +
  • [32] Convert API drilling and completion fluids and well cement standards to ISO standards
    Bensted, John
    Petroleum Engineer International, 1995, 67 (09):
  • [33] Prediction model of casing annulus pressure for deepwater well drilling and completion operation
    Yang Jin
    Tang Haixiong
    Liu Zhengli
    Yang Liping
    Huang Xiaolong
    Yan De
    Tian Ruirui
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2013, 40 (05) : 661 - 664
  • [34] Prediction model of casing annulus pressure for deepwater well drilling and completion operation
    Yang, Jin
    Tang, Haixiong
    Liu, Zhengli
    Yang, Liping
    Huang, Xiaolong
    Yan, De
    Tian, Ruirui
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2013, 40 (05): : 616 - 619
  • [35] Innovative Approach To Increase Well Productivity by Adapting Drilling Targets and Completion Methodology
    Aro, Dustin
    Hilton, Tim
    Bradham, Connor
    Gibbons, Robert
    Journal of Petroleum Technology, 2024, 76 (11): : 67 - 71
  • [36] New well architectures increase gas recovery and reduce drilling costs
    Horn, MJ
    Plathey, DP
    SPE DRILLING & COMPLETION, 1998, 13 (03) : 144 - 150
  • [37] Remotely operated guideposts reduce drilling time and costs
    Watkins, Sabrina S., 1600, (42):
  • [38] REMOTELY OPERATED GUIDEPOSTS REDUCE DRILLING TIME AND COSTS
    WATKINS, SS
    BEATO, CL
    VETTER, VH
    JOURNAL OF PETROLEUM TECHNOLOGY, 1990, 42 (03): : 272 - &
  • [39] Controllable Sealing of the Bottom Hole Area of Formations During Well Drilling and Completion.
    Mavlyutov, M.R.
    Kuznetsov, Yu.S.
    Polyakov, V.N.
    Oil Industry, 1984, (06): : 7 - 10
  • [40] ANALYSIS OF APPLICATION EFFICIENCY OF FOAM SYSTEMS DURING WELL COMPLETION AFTER THEIR DRILLING AND REPAIR
    DOLGIKH, GM
    PETUKHOV, VA
    YURTAEV, AV
    NEFTYANOE KHOZYAISTVO, 1986, (11): : 47 - 49