Considering time and space in drilling and completion can reduce well interference

被引:0
|
作者
Feder J.
机构
来源
JPT, Journal of Petroleum Technology | 2019年 / 71卷 / 09期
关键词
Well completion - Shale - Oil wells - Hydraulic fracturing - Well spacing - Infill drilling;
D O I
10.2118/0919-0078-JPT
中图分类号
学科分类号
摘要
Development of organic shale reservoirs with large hydraulic- fracture treatments not only poses challenges to the completion of a single well, but also to interference with surrounding wells. A direct consequence of interference is production loss. Therefore, the drilling and completion schedule for field development must be 4D in time and space to account for interaction in between wells. The complete paper describes a physics-based model of interference and a sensitivity study to propose guidelines for well spacing and a drilling timeline for multiple horizontal wells in the Vaca Muerta shale. © 2019 Society of Petroleum Engineers. All rights reserved.
引用
收藏
页码:78 / 80
页数:2
相关论文
共 50 条
  • [21] HIGHER PUMP PRESSURES CAN REDUCE DRILLING COSTS
    VANSTRIJP, AJR
    FEENSTRA, R
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1979, 101 (01): : 59 - 65
  • [22] CONTROLLING BARITE SAG CAN REDUCE DRILLING PROBLEMS
    ZAMORA, M
    JEFFERSON, D
    OIL & GAS JOURNAL, 1994, 92 (07) : 47 - 52
  • [23] Waste minimization program can reduce drilling costs
    Hall, Charles R.
    Spell, Richard A.
    Oil and Gas Journal, 1991, 89 (26): : 43 - 46
  • [24] Space-time completion of video
    Wexler, Yonatan
    Shechtman, Eli
    Irani, Michal
    IEEE TRANSACTIONS ON PATTERN ANALYSIS AND MACHINE INTELLIGENCE, 2007, 29 (03) : 463 - 476
  • [25] Controlling barite sag can reduce drilling problems
    Zamora, Mario
    Jefferson, Dan
    Oil and Gas Journal, 1994, 92 (07): : 47 - 52
  • [26] Space-time video completion
    Wexler, Y
    Shechtman, E
    Irani, M
    PROCEEDINGS OF THE 2004 IEEE COMPUTER SOCIETY CONFERENCE ON COMPUTER VISION AND PATTERN RECOGNITION, VOL 1, 2004, : 120 - 127
  • [27] REDUCE DRILLING TIME 35-PERCENT
    不详
    CUTTING TOOL ENGINEERING, 1976, 28 (5-6): : 12 - 12
  • [28] A Novel Method to Reduce the Laser Drilling Time for Hole Cluster considering the Influence of Residual Vibration of the Sample Stage
    Wang, Xiaodong
    Liu, Bin
    Mei, Xuesong
    Yang, Jun
    Yun, Xialun
    Li, Xiao
    Li, Jian
    SHOCK AND VIBRATION, 2020, 2020
  • [29] Progress and prospect of CNOOC's oil and gas well drilling and completion technologies
    Li Z.
    Xie R.
    Wu Y.
    Yuan J.
    Natural Gas Industry, 2021, 41 (08) : 178 - 185
  • [30] Progress and prospect of CNOOC's oil and gas well drilling and completion technologies
    Li, Zhong
    Xie, Renjun
    Wu, Yi
    Yuan, Junliang
    NATURAL GAS INDUSTRY B, 2022, 9 (02) : 209 - 217