Integrating quality in resource-constrained time-cost trade-off optimization for civil construction projects using NSGA-III technique

被引:0
|
作者
Shrivastava A. [1 ]
Pandey M. [1 ]
机构
[1] Civil Engineering Department, Institute of Technology and Management University, Gwalior
关键词
Construction projects; NSGA III; Optimization; TCQT;
D O I
10.1007/s42107-024-01068-y
中图分类号
学科分类号
摘要
In the realm of civil construction projects, achieving an optimal balance between project time, cost, and quality is paramount for ensuring project success and stakeholder satisfaction. Traditional optimization approaches often focus solely on time and cost, potentially neglecting the critical aspect of quality. This study presents a novel framework aimed at integrating quality considerations into resource-constrained time-cost trade-off optimization process using Non-dominated Sorting Genetic Algorithm III (NSGA III) technique. The proposed framework addresses the inherent trade-offs among time, cost, and quality by simultaneously optimizing these objectives. By leveraging NSGA-III, a powerful multi-objective optimization algorithm, the framework generates a set of Pareto-optimal solutions that represent various trade-off options. This enables decision-makers to explore and select solutions that best align with project objectives and constraints. Through solving a real case study project, the effectiveness of the proposed framework is demonstrated in real-world civil construction projects. Results of the study indicate that integrating quality considerations into the time-cost trade-off optimization process leads to more informed decision-making, ultimately enhancing project outcomes and stakeholder satisfaction. This research contributes to advancing the field of project management in civil construction by providing a systematic approach for addressing the complex interplay of time, cost, and quality objectives. © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2024.
引用
收藏
页码:4619 / 4632
页数:13
相关论文
共 50 条
  • [31] Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [32] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [33] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [34] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189
  • [35] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [36] Using genetic algorithms to solve construction time-cost trade-off problems
    Univ of Illinois at Urbana-Champaign, Urbana, United States
    J Comput Civ Eng, 3 (184-189):
  • [37] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [38] Modelling the resource constrained time-cost-quality-safety risk-environmental impact trade-off using opposition-based NSGA III
    Sharma K.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2023, 24 (8) : 3083 - 3098
  • [39] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [40] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD
    LIU, L
    BURNS, SA
    FENG, CW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454