共 50 条
- [21] Model Research of Multi-Objective and Resource-Constrained Project Scheduling Problem 19TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: MANAGEMENT SYSTEM INNOVATION, 2013, : 991 - 1001
- [25] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
- [26] A MULTI-OBJECTIVE MODEL FOR TIME-COST-QUALITY-RISK TRADE-OFF PROBLEMS IN PROJECT MANAGEMENT INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2022, 29 (06): : 826 - 838
- [27] Solving a multi-objective resource-constrained project scheduling problem using a cuckoo optimization algorithm Azimi, P. (p.azimi@yahoo.com), 1600, Sharif University of Technology (21):
- [30] Time and Cost trade-off using multi-objective task scheduling in utility Grids PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON COMPUTER AND KNOWLEDGE ENGINEERING (ICCKE 2013), 2013, : 362 - 367