Solving a multi-objective resource-constrained project scheduling problem using a cuckoo optimization algorithm

被引:0
|
作者
Ghamginzadeh, A. [1 ]
Najafi, A. A. [2 ]
Azimi, P. [1 ]
机构
[1] Islamic Azad Univ, Fac Ind & Mech Engn, Qazvin Branch, Qazvin, Iran
[2] KN Toosi Univ Technol, Fac Ind Engn, Tehran, Iran
关键词
Project scheduling; Net present value; Cuckoo optimization algorithm;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling is an important factor in project success. In the real world atmosphere, project scheduling problems involve multiple objectives which must be optimized simultaneously. According to the literature, several meta-heuristic algorithms have been used in single objective resource-constrained project scheduling problems, but very few of them have used a multi-objective framework. In this study, we focus on a multi-objective resource-constrained project scheduling problem by minimizing project completion time and the time value of project costs, which is the main contribution of the current research. The goal is to provide an algorithm that can find optimum Pareto front solutions, using a multi-objective cuckoo optimization algorithm. In order to increase the efficiency of the algorithm, the algorithm parameters are tuned using Taguchi tests. Finally, the solutions derived from the algorithm have been compared to those obtained from NSGA-II. The experiments show the efficiency of the proposed algorithm. (C) 2014 Sharif University of Technology. All rights reserved.
引用
收藏
页码:2419 / 2428
页数:10
相关论文
共 50 条
  • [1] Solving a multi-objective resource-constrained project scheduling problem using a cuckoo optimization algorithm
    Azimi, P. (p.azimi@yahoo.com), 1600, Sharif University of Technology (21):
  • [2] Model Research of Multi-Objective and Resource-Constrained Project Scheduling Problem
    Zhou, Rong
    Ye, Chun-ming
    Ma, Hui-min
    19TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: MANAGEMENT SYSTEM INNOVATION, 2013, : 991 - 1001
  • [3] An improved NSGA-II algorithm for multi-objective resource-constrained project scheduling problem
    Wang F.
    Han M.-C.
    Zhao Y.-Y.
    Zhang H.
    Kongzhi yu Juece/Control and Decision, 2021, 36 (03): : 669 - 676
  • [4] Solving Resource-Constrained Project Scheduling Problem Using Metaheuristic Algorithm
    Munlin, Mudarmeen
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC ENGINEERING (ICEEE), 2018, : 344 - 349
  • [5] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [6] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [7] A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (04) : 2093 - 2128
  • [8] Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem
    Laszczyk, Maciej
    Myszkowski, Pawel B.
    INFORMATION SCIENCES, 2019, 481 : 412 - 431
  • [9] Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
    Gomes, Helton Cristiano
    das Neves, Francisco de Assis
    Freitas Souza, Marcone Jamilson
    COMPUTERS & OPERATIONS RESEARCH, 2014, 44 : 92 - 104
  • [10] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)