共 50 条
- [45] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
- [49] Two categories of Resource-Constrained Time/Cost Trade-off Project scheduling problem and its two-stage hybrid optimizing algorithm Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (09): : 2035 - 2043
- [50] Systematic solution procedure for time-cost trade-off problems INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168