Engineer-to-order (ETO) firms produce complex - one of a kind - products and desire shorter lead times as a key component to cost competitiveness. In ETO firms, the engineering process is the largest controllable consumer of lead time. Given that lead time is a function of completion rate and scheduling policy, one critical process is to accurately sequence jobs in front of the engineering function. However, unlike other manufacturing models, such as make-to-stock or make-to-order models, the design for an ETO product is not realized until after the engineering process has been completed. Hence, the only information available does not include data normally required by most sequencing algorithms. Therefore, the problem becomes the determination of an accurate schedule within a complex transactional process for jobs which have not even been designed yet. This paper investigates this topic in the context of the engineering process within the ETO model. Based on research conducted in conjunction with multiple firms, common factors are identified which drive complexity, and a new framework and algorithm are presented for using these factors to sequence jobs. Using discrete event simulation, the performance of this new algorithm is found to be a significant improvement over current industry and published methods.
引用
收藏
页码:201 / 217
页数:17
相关论文
共 50 条
  • [1] Developing due dates in an engineer-to-order engineering environment
    Grabenstetter, Douglas H.
    Usher, John M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (21) : 6349 - 6361
  • [2] Managing engineering changes in the engineer-to-order environment: challenges and research needs
    Iakymenko, Natalia
    Romsdal, Anita
    Semini, Marco
    Strandhagen, Jan Ola
    IFAC PAPERSONLINE, 2018, 51 (11): : 144 - 151
  • [3] Engineering Change Management in the Engineer-to-Order Production Environment: Insights from Two Case Studies
    Iakymenko, Natalia
    Romsdal, Anita
    Semini, Marco
    Strandhagen, Jan Ola
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR DATA-DRIVEN, INTELLIGENT, COLLABORATIVE, AND SUSTAINABLE MANUFACTURING, APMS 2018, 2018, 535 : 131 - 138
  • [4] Requirements for Sales and Operations Planning in an Engineer-to-Order Manufacturing Environment
    Bhalla, Swapnil
    Alfnes, Erlend
    Hvolby, Hans-Henrik
    Oluyisola, Olumide Emmanuel
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, APMS 2021, PT IV, 2021, 633 : 371 - 380
  • [5] Automation and engineer-to-order: A paradox?
    Grenzenlose Automatisierung?: Herausforderung kundenindividuelle Produkte
    1600, Carl Hanser Verlag (109):
  • [6] Taxonomy of Engineer-To-Order Companies
    Sriram, Pavan Kumar
    Alfnes, Erlend
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, APMS 2014, PT III, 2014, 440 : 579 - 587
  • [7] Status of engineering change management in the engineer-to-order production environment: insights from a multiple case study
    Iakymenko, Natalia
    Romsdal, Anita
    Alfnes, Erlend
    Semini, Marco
    Strandhagen, Jan Ola
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (15) : 4506 - 4528
  • [8] A conceptual framework for a ubiquitous autonomous work system in the Engineer-To-Order environment
    Damir Husejnagić
    Alojzij Sluga
    The International Journal of Advanced Manufacturing Technology, 2015, 78 : 1971 - 1988
  • [9] The future of Engineering - Scenarios of the future way of working in the engineer-to-order business
    Vollmar, Jan
    Gepp, Michael
    Schertl, Andreas
    2017 11TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON), 2017, : 245 - 249
  • [10] Lean manufacturing tool in engineer-to-order environment: Project cost deployment
    Braglia, Marcello
    Frosolini, Marco
    Gallo, Mose
    Marrazzini, Leonardo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (06) : 1825 - 1839