Sequencing jobs in an engineer-to-order engineering environment

被引:18
|
作者
Grabenstetter, Douglas H. [1 ]
Usher, John M. [1 ]
机构
[1] Mississippi State Univ, Dept Ind & Syst Engn, Mississippi State, MS 39762 USA
关键词
engineer-to-order; sequencing; design;
D O I
10.1080/21693277.2015.1035461
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Engineer-to-order (ETO) firms produce complex - one of a kind - products and desire shorter lead times as a key component to cost competitiveness. In ETO firms, the engineering process is the largest controllable consumer of lead time. Given that lead time is a function of completion rate and scheduling policy, one critical process is to accurately sequence jobs in front of the engineering function. However, unlike other manufacturing models, such as make-to-stock or make-to-order models, the design for an ETO product is not realized until after the engineering process has been completed. Hence, the only information available does not include data normally required by most sequencing algorithms. Therefore, the problem becomes the determination of an accurate schedule within a complex transactional process for jobs which have not even been designed yet. This paper investigates this topic in the context of the engineering process within the ETO model. Based on research conducted in conjunction with multiple firms, common factors are identified which drive complexity, and a new framework and algorithm are presented for using these factors to sequence jobs. Using discrete event simulation, the performance of this new algorithm is found to be a significant improvement over current industry and published methods.
引用
收藏
页码:201 / 217
页数:17
相关论文
共 50 条
  • [41] Applicability of the capability maturity model for engineer-to-order firms
    Veldman, Jasper
    Klingenberg, Warse
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2009, 48 (02) : 219 - 239
  • [42] Analyzing the factors affecting engineering change implementation performance in the engineer-to-order production environment: case studies from a Norwegian shipbuilding group
    Iakymenko, Natalia
    Brett, Per Olaf
    Alfnes, Erlend
    Strandhagen, Jan Ola
    PRODUCTION PLANNING & CONTROL, 2022, 33 (9-10) : 957 - 973
  • [43] Implications of automation in engineer-to-order production:a case study
    Borge Sjobakk
    Maria Kollberg Thomassen
    Erlend Alfnes
    Advances in Manufacturing, 2014, 2 (02) : 141 - 149
  • [44] The impact of design uncertainty in engineer-to-order project planning
    Vaagen, Hajnalka
    Kaut, Michal
    Wallace, Stein W.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (03) : 1098 - 1109
  • [45] Product life cycle management in engineer-to-order industries
    Hicks, Christian
    McGovern, Tom
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2009, 48 (02) : 153 - 167
  • [46] Identifying profitable reference architectures in an engineer-to-order context
    Lokkegaard, Martin
    Bertram, Christian Alexander
    Mortensen, Niels Henrik
    Hvam, Lars
    Haug, Anders
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (04) : 1358 - 1372
  • [47] Optimal Purification Decisions for Engineer-to-Order Proteins at Aldevron
    Martagan, Tugce
    Krishnamurthy, Ananth
    Leland, Peter A.
    Maravelias, Christos T.
    PRODUCTION AND OPERATIONS MANAGEMENT, 2016, 25 (12) : 2003 - 2005
  • [48] Supply chain management in construction and engineer-to-order industries
    Cigolini, Roberto
    Gosling, Jonathan
    Iyer, Ananth
    Senicheva, Olga
    PRODUCTION PLANNING & CONTROL, 2022, 33 (9-10) : 803 - 810
  • [49] A supply chain flexibility framework for engineer-to-order systems
    Gosling, Jonathan
    Naim, Mohamed
    Towill, Denis
    PRODUCTION PLANNING & CONTROL, 2013, 24 (07) : 552 - 566
  • [50] Procurement and Contractual Choices for Engineer-to-Order Supply Chains
    Gosling J.
    Hewlett B.
    Naim M.
    IEEE Engineering Management Review, 2021, 49 (01): : 174 - 180