Sequencing jobs in an engineer-to-order engineering environment

被引:18
|
作者
Grabenstetter, Douglas H. [1 ]
Usher, John M. [1 ]
机构
[1] Mississippi State Univ, Dept Ind & Syst Engn, Mississippi State, MS 39762 USA
关键词
engineer-to-order; sequencing; design;
D O I
10.1080/21693277.2015.1035461
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Engineer-to-order (ETO) firms produce complex - one of a kind - products and desire shorter lead times as a key component to cost competitiveness. In ETO firms, the engineering process is the largest controllable consumer of lead time. Given that lead time is a function of completion rate and scheduling policy, one critical process is to accurately sequence jobs in front of the engineering function. However, unlike other manufacturing models, such as make-to-stock or make-to-order models, the design for an ETO product is not realized until after the engineering process has been completed. Hence, the only information available does not include data normally required by most sequencing algorithms. Therefore, the problem becomes the determination of an accurate schedule within a complex transactional process for jobs which have not even been designed yet. This paper investigates this topic in the context of the engineering process within the ETO model. Based on research conducted in conjunction with multiple firms, common factors are identified which drive complexity, and a new framework and algorithm are presented for using these factors to sequence jobs. Using discrete event simulation, the performance of this new algorithm is found to be a significant improvement over current industry and published methods.
引用
收藏
页码:201 / 217
页数:17
相关论文
共 50 条
  • [21] Engineer-to-Order Companies are Reserved on Adoption of Current Engineering Trends - An Empirical Study
    Gepp, M.
    Goelzer, P.
    Grobholz, B.
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 1525 - 1530
  • [22] Identifying modular candidates in engineer-to-order companies
    Christensen, Carsten Keinicke Fjord
    Mortensen, Niels Henrik
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2022, 30 (02): : 159 - 170
  • [23] Exploring the archetypes of engineer-to-order: an empirical analysis
    Willner, Olga
    Powell, Daryl
    Gerschberger, Markus
    Schonsleben, Paul
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2016, 36 (03) : 242 - 264
  • [24] The impact of flexibility on engineer-to-order production planning
    Brachmann, Robert
    Kolisch, Rainer
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 239
  • [25] Digitalized Manufacturing Logistics in Engineer-to-Order Operations
    Strandhagen, Jo Wessel
    Buer, Sven-Vegard
    Semini, Marco
    Alfnes, Erlend
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR THE FACTORY OF THE FUTURE, PT I, 2019, : 579 - 587
  • [26] Dynamic scheduling for complex engineer-to-order products
    Hicks, C.
    Song, D. P.
    Earl, C. F.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (15) : 3477 - 3503
  • [27] Planning and organization of engineer-to-order production networks
    Sender J.
    Illgen B.
    Klink S.
    Flügge W.
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2020, 115 (1-2): : 19 - 22
  • [28] Estimating software speeds up engineer-to-order
    Tinham, Brian
    Manufacturing Computer Solutions, 2000, 6 (08): : 33 - 34
  • [29] Integrated planning and scheduling in the engineer-to-order sector
    Little, D
    Rollins, R
    Peck, M
    Porter, JK
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2000, 13 (06) : 545 - 554
  • [30] Engineer-to-Order Enabling Process: An Empirical Analysis
    Duchi, Aldo
    Maghazei, Omid
    Sili, Davide
    Bassan, Marco
    Schoensleben, Paul
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II, 2015, 460 : 223 - 231