SIMULATION STUDY OF JOB SHOP SCHEDULING WITH DUE DATES

被引:6
|
作者
CHENG, TCE
机构
[1] Univ of Manitoba, Winnipeg, Manit,, Can, Univ of Manitoba, Winnipeg, Manit, Can
关键词
D O I
10.1080/00207728808967610
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
10
引用
收藏
页码:383 / 390
页数:8
相关论文
共 50 条
  • [21] JOB SHOP SCHEDULING TO MEET DUE DATES WITH CONSIDERATION TO SEQUENCE DEPENDENT SETUP TIMES IN A DYNAMIC ENVIRONMENT
    Eguchi, Toru
    Nishi, Katsutoshi
    Kawai, Hiroaki
    Murayama, Takeshi
    PROCEEDINGS OF THE ASME/ISCIE INTERNATIONAL SYMPOSIUM ON FLEXIBLE AUTOMATION, ISFA 2012, 2013, : 365 - 368
  • [22] Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates
    Zozom, A
    Hodgson, TJ
    King, RE
    Weintraub, AJ
    Cormier, D
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (01) : 31 - 45
  • [23] The just-in-time job-shop scheduling problem with distinct due-dates for operations
    Mohammad Mahdi Ahmadian
    Amir Salehipour
    Journal of Heuristics, 2021, 27 : 175 - 204
  • [24] Job shop scheduling based on earliness and tardiness penalties with due dates and deadlines: an enhanced genetic algorithm
    Hong-an Yang
    Qi-feng Sun
    Can Saygin
    Shu-dong Sun
    The International Journal of Advanced Manufacturing Technology, 2012, 61 : 657 - 666
  • [25] The just-in-time job-shop scheduling problem with distinct due-dates for operations
    Ahmadian, Mohammad Mahdi
    Salehipour, Amir
    JOURNAL OF HEURISTICS, 2021, 27 (1-2) : 175 - 204
  • [26] Automated job shop scheduling with dynamic processing times and due dates using project management and industry 4.0
    Kianpour, Parsa
    Gupta, Deepak
    Krishnan, Krishna Kumar
    Gopalakrishnan, Bhaskaran
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2021, 38 (07) : 485 - 498
  • [27] Scheduling job shop - A case study
    Abbas, M.
    Abbas, A.
    Khan, W. A.
    14TH INTERNATIONAL SYMPOSIUM ON ADVANCED MATERIALS (ISAM 2015), 2016, 146
  • [28] ANALYTICAL DETERMINATION OF OPTIMAL TWK DUE-DATES IN A JOB SHOP
    CHENG, TCE
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1985, 16 (06) : 777 - 787
  • [29] THE EFFECT OF WORKLOAD DEPENDENT DUE-DATES ON JOB SHOP PERFORMANCE
    BERTRAND, JWM
    MANAGEMENT SCIENCE, 1983, 29 (07) : 799 - 816
  • [30] Scheduling a single machine with multiple due dates per job
    Kuehn, Raphael
    Weiss, Christian
    Ackermann, Heiner
    Heydrich, Sandy
    JOURNAL OF SCHEDULING, 2024, 27 (06) : 565 - 585