共 50 条
- [1] JOB SHOP SCHEDULING WITH DUE DATES AND VARIABLE PROCESSING TIMES MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 20 (09): : 1264 - 1275
- [2] Solving Job-Shop Scheduling Problems with Fuzzy Processing Times and Fuzzy Due Dates INFORMATION PROCESSING AND MANAGEMENT OF UNCERTAINTY IN KNOWLEDGE-BASED SYSTEMS: THEORY AND FOUNDATIONS, IPMU 2018, PT I, 2018, 853 : 790 - 799
- [3] JOB SHOP SCHEDULING TO MEET DUE DATES WITH CONSIDERATION TO SEQUENCE DEPENDENT SETUP TIMES IN A DYNAMIC ENVIRONMENT PROCEEDINGS OF THE ASME/ISCIE INTERNATIONAL SYMPOSIUM ON FLEXIBLE AUTOMATION, ISFA 2012, 2013, : 365 - 368
- [5] JOB SHOP SCHEDULING WITH DUE DATES AND OVERTIME CAPABILITY MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 21 (01): : 68 - 78
- [6] Job shop scheduling with unit, processing times PROCEEDINGS OF THE SIXTEENTH ANNUAL ACM-SIAM SYMPOSIUM ON DISCRETE ALGORITHMS, 2005, : 207 - 214
- [9] Determination of due dates in job shop scheduling by simulated annealing COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1996, 9 (02): : 65 - 72
- [10] Flow shop scheduling with two distinct job due dates Computers and Industrial Engineering, 2022, 163