SIMULATION STUDY OF JOB SHOP SCHEDULING WITH DUE DATES

被引:6
|
作者
CHENG, TCE
机构
[1] Univ of Manitoba, Winnipeg, Manit,, Can, Univ of Manitoba, Winnipeg, Manit, Can
关键词
D O I
10.1080/00207728808967610
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
10
引用
收藏
页码:383 / 390
页数:8
相关论文
共 50 条
  • [31] Flow shop scheduling with fuzzy due dates using genetic algorithm
    Wu, Yue
    Wang, Dingwei
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2000, 20 (02): : 108 - 112
  • [32] Heuristic procedures for scheduling job families with setups and due dates
    Baker, KR
    NAVAL RESEARCH LOGISTICS, 1999, 46 (08) : 978 - 991
  • [33] Heuristic procedures for scheduling job families with setups and due dates
    Amos Tuck Sch. of Bus. Admin., Dartmouth College, Hanover, NH 03755, United States
    Nav Res Logist, 8 (978-991):
  • [34] Job shop scheduling for meeting due dates and minimizing overtime using genetic algorithm incorporating new priority rules
    Yoda, Mitsunobu
    Eguchi, Toru
    Murayama, Takeshi
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2014, 8 (05):
  • [35] DYNAMIC JOB SHOP SCHEDULING - A SURVEY OF SIMULATION RESEARCH
    RAMASESH, R
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1990, 18 (01): : 43 - 57
  • [36] ITERATIVE SIMULATION AND OPTIMIZATION APPROACH FOR JOB SHOP SCHEDULING
    Kulkarni, Ketki
    Venkateswaran, Jayendran
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1620 - 1631
  • [37] A job shop scheduling approach based on simulation optimization
    Yan, Yan
    Wang, Guoxin
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1816 - 1822
  • [38] TOWARD EXPERT SIMULATION SYSTEMS IN JOB SHOP SCHEDULING
    MEJTSKY, GJ
    AFIPS CONFERENCE PROCEEDINGS, 1986, 55 : 143 - &
  • [39] Dynamic simulation of job shop scheduling for optimal performance
    Selladurai, V
    Aravindan, P
    Ponnambalam, SG
    Gunasekaran, A
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1995, 15 (07) : 106 - &
  • [40] Dynamic assignation of due dates in an assembly shop based in simulation
    Roman, DB
    delValle, AG
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (06) : 1539 - 1554