共 50 条
- [42] Experience in burning Ekibastuz coals in the boilers of the 500-MW power units at the Ekibastuz district power stations Thermal Engineering, 1999, 46 (09): : 722 - 733
- [45] Condensate polishing system for PWR nuclear power plant PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 1, 2011, : 67 - 72
- [46] CONDENSATE POLISHING AT SURRY NUCLEAR POWER STATION. Electric Power Research Institute (Report) EPRI NP, 1983, (3037):
- [48] Investigation of the air medium parameter state in the main building of a thermal power plant with 300 MW power units Teploenergetika, 1997, (08): : 60 - 64
- [50] The in situ repair of the bottom cover of a 300MW pump turbine at Dinorwig power station HYDRO POWER DEVELOPMENTS - CURRENT PROJECTS, REHABILITATION, AND POWER RECOVERY, 1997, 97 (04): : 63 - 71