TURBINE CONDENSATE POLISHING IN POWER STATIONS WITH 300 MW UNITS

被引:0
|
作者
PROKHORO.FG
机构
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:1 / &
相关论文
共 50 条
  • [31] Problem Analysis and Treatment Based on Condensate Polishing System in 600MW Unit of Power Plant
    Yang, Tao
    Wang, Shaojun
    Liu, Yaokai
    Zhao, Zhansheng
    Lv, Gaozhi
    ENERGY AND POWER TECHNOLOGY, PTS 1 AND 2, 2013, 805-806 : 1198 - +
  • [32] OPTIMIZATION OF THE MODES OF USING GENERATING-UNITS OF THERMAL POWER-STATIONS 160-300 MW IN CAPACITY FOR HEAT-SUPPLY
    AVERBAKH, YA
    BRAZOVSKII, VP
    GITMAN, MI
    GONCHAROV, GI
    LEVIN, LI
    MASLOVA, TA
    PRIVEZENTSEVA, SV
    PRUSS, SZ
    THERMAL ENGINEERING, 1980, 27 (02) : 67 - 70
  • [33] Results of Integrated Improvement of 300 MW Power Units of the Karmanovo District Power Station.
    Abdurashitov, Sh.R.
    Filat'eva, I.A.
    Gavrilov, A.F.
    Zeger, K.E.
    Efimochkin, G.I.
    Khakimov, A.G.
    Krokhalev, B.M.
    Teploenergetika, 1976, (04): : 5 - 8
  • [34] Life management of 300 MW/600 MW fossil turbine
    Zhang, Da-Ji
    Wang, Li-Hai
    Guan, Wei-Shi
    Xu, Yi-Nan
    Qilunji Jishu/Turbine Technology, 2001, 43 (06):
  • [35] THE POSSIBLE ARRANGEMENTS FOR POLISHING CONDENSATE IN NUCLEAR-POWER STATIONS USING CARBOXYLIC CATION-EXCHANGE RESIN
    ZORIN, VM
    STOYANOVA, SI
    THERMAL ENGINEERING, 1980, 27 (10) : 548 - 549
  • [36] AIR EJECTORS OF 300 MW TURBINE PLANTS
    EFIMOCHK.GI
    KONOVALO.GM
    THERMAL ENGINEERING, 1972, 18 (06) : 32 - &
  • [37] Modernization of the 300-MW power generating units at the Konakovo State Regional Electric Power Plant
    Melnikov A.V.
    Avrutsky G.D.
    Lazarev M.V.
    Savenkova I.A.
    Lazareva M.V.
    Simoyu L.L.
    Gaev V.D.
    Melnikov, A.V., 1600, Springer Science and Business Media, LLC (46): : 387 - 391
  • [38] EXPERIMENTAL DETERMINATION AND ANALYSIS OF THE DYNAMIC PROPERTIES OF 300-mw POWER UNITS.
    Kulakov, G.T.
    Litvinets, V.I.
    1600,
  • [39] A Study of the Parameters of the Atmosphere in the Main Building of a Thermal Power Station with 300-MW Power Units
    Skubienko, S.V.
    Madoyan, A.A.
    Borisov, G.M.
    Thermal Engineering, 1997, 44 (08): : 670 - 674
  • [40] INFORMATION SYSTEM MONITORING COOLANT QUALITY IN 300 MW POWER GENERATING UNITS.
    Zhivilova, L.M.
    Shcherbakova, K.N.
    Fomichev, Yu.P.
    Perekhozhev, S.V.
    Mogilevskii, D.I.
    1600, (31):