The impact of contractors' management capability on cost and time performance of construction projects in Nigeria

被引:22
|
作者
Aje, O. [1 ]
Odusami, K. [2 ]
Ogunsemi, D. [1 ]
机构
[1] Fed Univ Technol Akure, Sch Environm Technol, Dept Quality Surveying, Akure, Nigeria
[2] Univ Lagos, Fac Environm Studies, Dept Bldg, Akoka, Nigeria
关键词
Construction industry; Costs; Management skills; Time-based management; Nigeria;
D O I
10.1108/13664380910977619
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose - Management capability is one of the major criteria for evaluating construction contractors during prequalification and tender evaluation This paper aims to investigate the impact of contractors' management capability as a prequalification criterion on cost and time performance of selected building projects. Design/methodology/approach - Prequalification assessments of management capability of wining contractors as well as cost data relating to 77 completed building projects executed between 2004 and 2007 are obtained. The data obtained from a questionnaire and archival data are analyzed using one-way analysis of variance and multiple regression. Findings - The results reveal that contractors' management capability has significant impact on cost and time performance of building projects as evidenced by p-values of 0.042 and 0.039, respectively. Practical implications - The research could be of significant benefit at the research implementation stage of public procurement practice especially in relation to the construction industry in Nigeria. Construction practitioners involved in prequalification and tender evaluation should continue to seek relevant information relating to management capability from the candidate contractors during prequalification and tender evaluation. Originality/value - Models capable of predicting the final cost and duration of building projects are eventually derived based on prequalification assessment of contractors on management capability, proposed contract duration and the initial contract figure. The goodness of fit of the models as defined by the value of R-2 is found to be 96.2 percent and 90.01 percent for cost and time, respectively; thus signifying high predictive efficacy of the models.
引用
收藏
页码:171 / +
页数:18
相关论文
共 50 条
  • [41] Impact of knowledge management on construction projects
    Suresh S.
    Olayinka R.
    Chinyio E.
    Renukappa S.
    Proc. Inst. Civ. Eng. Manag. Procure. Law, 1 (27-43): : 27 - 43
  • [42] Achieving improved performance in construction projects: advanced time and cost optimization framework
    Pham, Vu Hong Son
    Dang, Nghiep Trinh Nguyen
    Nguyen, Van Nam
    EVOLUTIONARY INTELLIGENCE, 2024, 17 (04) : 2885 - 2897
  • [43] Project Leadership and Its Impact on Time Performance in Nigerian Construction Projects
    Buba, Simon-Peter G.
    Chitumu, Danladi Z.
    Ibrahim, Haruna M.
    ADVANCED SCIENCE LETTERS, 2018, 24 (05) : 3791 - 3796
  • [44] Cost and time control of construction projects in the UK
    Yakubu, Olawale
    Sun, Ming
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 278 - 286
  • [45] Cost-time characteristics in construction projects
    1600, Publ by Canadian Soc for Civil Engineering, Montreal, Que, Can (2 pt 1):
  • [46] The impact of client characteristics on the time and cost performance of collaborative infrastructure projects
    Manley, Karen
    Chen, Le
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (04) : 511 - 532
  • [47] An investigation of the relationship between project performance measures and project management practices of construction projects for the construction industry in Nigeria
    Unegbu H.C.O.
    Yawas D.S.
    Dan-asabe B.
    Journal of King Saud University - Engineering Sciences, 2022, 34 (04) : 240 - 249
  • [48] INFLUENCE OF QUALITY PERFORMANCE ON CLIENTS' PATRONAGE OF INDIGENOUS AND EXPATRIATE CONSTRUCTION CONTRACTORS IN NIGERIA
    Idoro, Godwin Iroroakpo y
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 65 - 73
  • [49] An Inquiry into Extension Evaluation of Emergency Management Capability of Construction Projects
    Yuan, Xinsheng
    Zhang, Xiaobing
    Li, Junhua
    2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 4, 2010, : 248 - 251
  • [50] Estimating performance time for construction projects
    Hoffman, Greg J.
    Thal, Alfred E., Jr.
    Webb, Timothy S.
    Weir, Jeffery D.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2007, 23 (04) : 193 - 199