The impact of contractors' management capability on cost and time performance of construction projects in Nigeria

被引:22
|
作者
Aje, O. [1 ]
Odusami, K. [2 ]
Ogunsemi, D. [1 ]
机构
[1] Fed Univ Technol Akure, Sch Environm Technol, Dept Quality Surveying, Akure, Nigeria
[2] Univ Lagos, Fac Environm Studies, Dept Bldg, Akoka, Nigeria
关键词
Construction industry; Costs; Management skills; Time-based management; Nigeria;
D O I
10.1108/13664380910977619
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose - Management capability is one of the major criteria for evaluating construction contractors during prequalification and tender evaluation This paper aims to investigate the impact of contractors' management capability as a prequalification criterion on cost and time performance of selected building projects. Design/methodology/approach - Prequalification assessments of management capability of wining contractors as well as cost data relating to 77 completed building projects executed between 2004 and 2007 are obtained. The data obtained from a questionnaire and archival data are analyzed using one-way analysis of variance and multiple regression. Findings - The results reveal that contractors' management capability has significant impact on cost and time performance of building projects as evidenced by p-values of 0.042 and 0.039, respectively. Practical implications - The research could be of significant benefit at the research implementation stage of public procurement practice especially in relation to the construction industry in Nigeria. Construction practitioners involved in prequalification and tender evaluation should continue to seek relevant information relating to management capability from the candidate contractors during prequalification and tender evaluation. Originality/value - Models capable of predicting the final cost and duration of building projects are eventually derived based on prequalification assessment of contractors on management capability, proposed contract duration and the initial contract figure. The goodness of fit of the models as defined by the value of R-2 is found to be 96.2 percent and 90.01 percent for cost and time, respectively; thus signifying high predictive efficacy of the models.
引用
收藏
页码:171 / +
页数:18
相关论文
共 50 条
  • [21] A quantitative assessment of the cost and time impact of variation orders on construction projects
    Oladapo, A. A.
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2007, 5 (01) : 35 - 48
  • [22] CHARACTERISTICS OF COST MANAGEMENT IN CONSTRUCTION PROJECTS
    Simion-Melinte, Cezar
    GLOBALIZATION AND INTERCULTURAL DIALOGUE: MULTIDISCIPLINARY PERSPECTIVES - ECONOMY AND MANAGEMENT, 2014, : 810 - 818
  • [23] Quantifying the Impact of Technology Utilization on Schedule and Cost Performance in Construction Projects
    Salih, Fareed
    El-adaway, Islam H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (08)
  • [24] Cost Performance Estimation in Construction Projects Using Fuzzy Time Series
    Salari, Mostafa
    Yousefi, Nooshin
    Asgary, Mohhmad Mahdi
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (01) : 66 - 75
  • [25] Project Time Management and Schedule Performance in Mexican Construction Projects
    Solis-Carcano, Romel G.
    Corona-Suarez, Gilberto A.
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2119 - 2128
  • [26] Factors driving contractors to implement energy management strategies in construction projects
    Enshassi, Adnan
    Ayash, Abed
    Mohamed, Sherif
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2018, 23 (03) : 295 - 311
  • [27] Severity of Time Overrun Causes in Road Construction Projects: Contractors' Perspective
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 191 - 194
  • [28] AN ANALYSIS OF COST MANAGEMENT STRATEGIES EMPLOYED BY BUILDING CONTRACTORS ON PROJECTS IN ZIMBABWE
    Chigara, Benviolent
    Moyo, Tirivavi
    Mudzengerere, Fungai Hamilton
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2013, 4 (02): : 1 - 13
  • [29] Effect of contractual functions on contractors' consummate performance behaviors in construction projects
    Lu, Yongqiang
    Ma, Li
    Yao, Haona
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [30] Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects
    Alfalah, Ghasan
    Aldajani, Saad
    Elshaboury, Nehal
    Al-Sakkaf, Abobakr
    Alshamrani, Othman
    ADVANCES IN CIVIL ENGINEERING, 2024, 2024