Construction site layout planning using GIS overlay analysis—A case study

被引:2
|
作者
Atmaca M. [1 ]
Akcay C. [2 ]
机构
[1] Institute of Graduate Education, Istanbul University-Cerrahpaşa, Istanbul
[2] Faculty of Architecture, Istanbul University, Istanbul
关键词
ArcGIS; Construction site layout; GIS; Temporary facilities; Weighted overlay;
D O I
10.1007/s12517-021-06793-1
中图分类号
学科分类号
摘要
The main purpose of a planned construction project is the completion of targeted productions under specified constraints. For this purpose, a wide variety of organizations take place inside and outside of the construction site. Depending on the diversity and complexity of the organizations, the quality and efficiency of the work are directly affected. Achieving the goals of the construction site under various constraints gives workflow and planning prominence. With good planning, the workflow can be provided and the quality of the organizations within the construction site increases depending on this workflow, because efficient planning starts with the installation of the construction site. Mobilization, which means construction site installation, is critical for an efficient construction site. The mobilization plan, which is prepared for taking the construction site and all other criteria into account, is regarded as the first step for a planned construction site. Computer-aided systems are used in many fields with developments in recent years. GIS (Geographical Information Systems) has the potential to generate new information from location data. In this study, a decision support system has been developed utilizing GIS for mobilization, which is critical for construction site efficiency. In this regard, the “Weighted Overlay” plug-in within the ArcGIS software, which is one of the GIS tools, has been used as an auxiliary tool in the site selection of temporary facilities which will be set up in mobilization, as well. In the final stage, a mobilization plan was prepared for a construction site selected for the case study. © 2021, Saudi Society for Geosciences.
引用
收藏
相关论文
共 50 条
  • [41] A hybrid WOA-CBO algorithm for construction site layout planning problem
    Kaveh, A.
    Moghaddam, M. Rastegar
    SCIENTIA IRANICA, 2018, 25 (03) : 1094 - 1104
  • [42] A Novel Hybrid Metaheuristic Algorithm for Optimization of Construction Management Site Layout Planning
    Prayogo, Doddy
    Cheng, Min-Yuan
    Wu, Yu-Wei
    Redi, A. A. N. Perwira
    Yu, Vincent F.
    Persada, Satria Fadil
    Nadlifatin, Reny
    ALGORITHMS, 2020, 13 (05)
  • [43] Bilevel and multi-objective dynamic construction site layout and security planning
    Li, Zongmin
    Shen, Wenjing
    Xu, Jiuping
    Lev, Benjamin
    AUTOMATION IN CONSTRUCTION, 2015, 57 : 1 - 16
  • [44] A Typology Model of Temporary Facility Constraints for Automated Construction Site Layout Planning
    Kim, Minguk
    Ryu, Han-Guk
    Kim, Tae Wan
    APPLIED SCIENCES-BASEL, 2021, 11 (03): : 1 - 21
  • [45] The application of the ant colony optimization algorithm to the construction site layout planning problem
    Lam, Ka-Chi
    Ning, Xin
    Ng, Thomas
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (04) : 359 - 374
  • [46] Digitalized and User-Centered System for Construction Site Layout Planning and Assessment
    Shin, Jiyu
    Cho, Jongwoo
    Jang, Jun Young
    Kim, Tae Wan
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2025, 39 (03)
  • [47] Dynamic Site Layout Planning Using Approximate Dynamic Programming
    El-Rayes, Khaled
    Said, Hisham
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2009, 23 (02) : 119 - 127
  • [48] MATERIAL AND FACILITY LAYOUT PLANNING IN CONSTRUCTION PROJECTS USING SIMULATION
    Alanjari, Pejman
    RazaviAlavi, SeyedReza
    AbouRizk, Simaan
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 3388 - 3398
  • [49] Optimization of construction site layout using BIM generative design
    Salah, Mona
    Elbeltagi, Emad
    Elsheikh, Asser
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (03) : 314 - 322
  • [50] Construction site layout planning and safety management using fuzzy-based bee colony optimization model
    Nguyen, Phong Thanh
    NEURAL COMPUTING & APPLICATIONS, 2021, 33 (11): : 5821 - 5842