Construction site layout planning using GIS overlay analysis—A case study

被引:2
|
作者
Atmaca M. [1 ]
Akcay C. [2 ]
机构
[1] Institute of Graduate Education, Istanbul University-Cerrahpaşa, Istanbul
[2] Faculty of Architecture, Istanbul University, Istanbul
关键词
ArcGIS; Construction site layout; GIS; Temporary facilities; Weighted overlay;
D O I
10.1007/s12517-021-06793-1
中图分类号
学科分类号
摘要
The main purpose of a planned construction project is the completion of targeted productions under specified constraints. For this purpose, a wide variety of organizations take place inside and outside of the construction site. Depending on the diversity and complexity of the organizations, the quality and efficiency of the work are directly affected. Achieving the goals of the construction site under various constraints gives workflow and planning prominence. With good planning, the workflow can be provided and the quality of the organizations within the construction site increases depending on this workflow, because efficient planning starts with the installation of the construction site. Mobilization, which means construction site installation, is critical for an efficient construction site. The mobilization plan, which is prepared for taking the construction site and all other criteria into account, is regarded as the first step for a planned construction site. Computer-aided systems are used in many fields with developments in recent years. GIS (Geographical Information Systems) has the potential to generate new information from location data. In this study, a decision support system has been developed utilizing GIS for mobilization, which is critical for construction site efficiency. In this regard, the “Weighted Overlay” plug-in within the ArcGIS software, which is one of the GIS tools, has been used as an auxiliary tool in the site selection of temporary facilities which will be set up in mobilization, as well. In the final stage, a mobilization plan was prepared for a construction site selected for the case study. © 2021, Saudi Society for Geosciences.
引用
收藏
相关论文
共 50 条
  • [21] A decision-making system for construction site layout planning
    Ning, Xin
    Lam, Ka-Chi
    Lam, Mike Chun-Kit
    AUTOMATION IN CONSTRUCTION, 2011, 20 (04) : 459 - 473
  • [22] A hybrid simulation approach for site layout planning in construction projects
    Taghaddos, Hosein
    Heydari, Mohammad Hosein
    Asgari, AmirHosein
    CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (03): : 417 - 440
  • [23] Proposing a Standard Template for Construction Site Layout: A Case Study of a Norwegian Contractor
    Sjobakk, Borge
    Skjelstad, Lars
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT I, 2015, 459 : 316 - 323
  • [24] Construction Site Layout Planning Problem Using Two New Meta-heuristic Algorithms
    A. Kaveh
    M. Khanzadi
    M. Alipour
    M. Rastegar Moghaddam
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2016, 40 : 263 - 275
  • [25] Construction Site Layout Planning Problem Using Two New Meta-heuristic Algorithms
    Kaveh, A.
    Khanzadi, M.
    Alipour, M.
    Moghaddam, M. Rastegar
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2016, 40 (04) : 263 - 275
  • [26] A hybrid CAD-based construction site layout planning system using genetic algorithms
    Osman, HM
    Georgy, ME
    Ibrahim, ME
    AUTOMATION IN CONSTRUCTION, 2003, 12 (06) : 749 - 764
  • [27] Layout improvement of railway workshop using systematic layout planning (SLP) ? A case study
    Khariwal, Shubham
    Kumar, Pradeep
    Bhandari, Manish
    MATERIALS TODAY-PROCEEDINGS, 2021, 44 : 4065 - 4071
  • [28] Dynamic construction site layout planning: an application of branch and bond algorithm
    Sing, Michael C. P.
    Fung, Ivan W. H.
    Edwards, David John
    Liu, Henry
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2022, 40 (04) : 523 - 538
  • [29] Conjoining MMAS to GA to Solve Construction Site Layout Planning Problem
    Lam, Ka-Chi
    Ning, Xin
    Lam, Mike Chun-Kit
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (10) : 1049 - 1057
  • [30] Optimization algorithms for construction site layout planning: a systematic literature review
    Xu, Maozeng
    Mei, Zhongya
    Luo, Siyu
    Tan, Yi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (08) : 1913 - 1938