Fast combination of scheduling chains under resource and time constraints

被引:0
|
作者
Ji-min Wang
Xue-zeng Pan
Jie-bing Wang
Kang Sun
机构
[1] Zhejiang University,School of Computer Science and Technology
关键词
Fast combination algorithm; Chain-based scheduling algorithm; High-level synthesis (HLS); Minimum length prediction; TP391.7;
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling chain combination is the core of chain-based scheduling algorithms, the speed of which determines the overall performance of corresponding scheduling algorithm. However, backtracking is used in general combination algorithms to traverse the whole search space which may introduce redundant operations, so performance of the combination algorithm is generally poor. A fast scheduling chain combination algorithm which avoids redundant operations by skipping “incompatible” steps of scheduling chains and using a stack to remember the scheduling state is presented in this paper to overcome the problem. Experimental results showed that it can improve the performance of scheduling algorithms by up to 15 times. By further omitting unnecessary operations, a fast algorithm of minimum combination length prediction is developed, which can improve the speed by up to 10 times.
引用
收藏
页码:119 / 126
页数:7
相关论文
共 50 条
  • [2] Fast combination of scheduling chains under resource and time constraints
    Wang Ji-min
    Pan Xue-zeng
    Wang Jie-bing
    Sun Kang
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2007, 8 (01): : 119 - 126
  • [3] PREEMPTIVE SCHEDULING UNDER TIME AND RESOURCE CONSTRAINTS
    ZHAO, W
    RAMAMRITHAM, K
    STANKOVIC, JA
    IEEE TRANSACTIONS ON COMPUTERS, 1987, 36 (08) : 949 - 960
  • [4] Fault-tolerant scheduling under time and resource constraints
    Shu, L
    Young, M
    SEVENTH IEEE REAL-TIME TECHNOLOGY AND APPLICATIONS SYMPOSIUM, PROCEEDINGS, 2001, : 117 - 119
  • [5] ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS
    Shih, Neng-Hui
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 494 - 500
  • [6] Scheduling under labour resource constraints
    Heipcke S.
    Colombani Y.
    Cavalcante C.C.B.
    De Souza C.C.
    Constraints, 2000, 5 (4) : 415 - 422
  • [7] Resource-Constrained Project Scheduling Problem under Multiple Time Constraints
    Kong, Feng
    Dou, Dong
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [8] SCHEDULING UNDER RESOURCE CONSTRAINTS AND MODULE ASSIGNMENT
    BERGAMASCHI, RA
    CAMPOSANO, R
    PAYER, M
    INTEGRATION-THE VLSI JOURNAL, 1991, 12 (01) : 1 - 19
  • [9] Complexity of Scheduling Under Resource Constraints.
    Blazewicz, J.
    Weglarz, J.
    Archiwum Automatyki i Telemechaniki, 1984, 29 (1-2): : 3 - 33
  • [10] Scheduling with multiple voltages under resource constraints
    Sarrafzadeh, M
    Raje, S
    ISCAS '99: PROCEEDINGS OF THE 1999 IEEE INTERNATIONAL SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL 1: VLSI, 1999, : 350 - 353