Cost and water footprint trade-off in a supply chain optimization model

被引:0
|
作者
Dennis E. Cruz
Raymond R. Tan
机构
[1] De La Salle University,Department of Industrial & Systems Engineering
[2] De La Salle University,Department of Chemical Engineering
关键词
Supply chain; Water footprint; Material selection; Material substitution: Mathematical programming; Goal programming;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:3045 / 3064
页数:19
相关论文
共 50 条
  • [41] Time-Cost Trade-Off Optimization with a New Initial Population Approach
    Togan, Vedat
    Eirgas, Mohammad Azim
    TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
  • [42] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [43] Time-Quality-Cost Trade-Off Optimization and Application in Engineering Project
    Dong Na
    Liang Chuan
    Guo Chun-xiang
    Zou Zuo-jing
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1597 - +
  • [44] Study on the Trade-Off between Ecological Base Flow and Optimized Water Supply
    Hsu, Nien-Sheng
    Chiang, Chung-Hsiang
    Cheng, Wen-Ming
    Wei, Chih-Chiang
    WATER RESOURCES MANAGEMENT, 2012, 26 (11) : 3095 - 3112
  • [45] Product design outsourcing in a supply chain: impact of the design and conformance quality trade-off
    Seung Ho Yoo
    Dawoon Jung
    Kun Soo Park
    Operational Research, 2022, 22 : 4029 - 4055
  • [46] Dynamic Optimization of the Latency Throughput Trade-off in Parallel Chain Distributed Ledgers
    Campones, Pedro
    Domingos, Henrique
    39TH ANNUAL ACM SYMPOSIUM ON APPLIED COMPUTING, SAC 2024, 2024, : 226 - 234
  • [47] Time-cost trade-off optimization with a new initial population approach
    Toğan V.
    Eirgash M.A.
    Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2019, 30 (06): : 9561 - 9580
  • [48] Project time-cost trade-off optimization by maximal flow theory
    Liu, JM
    Rahbar, F
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 607 - 609
  • [49] Reliability and Cost Trade-Off Analysis of a Microgrid
    Skowronska, Annette
    Gorsich, David G.
    Mourelatos, Zissimos
    SAE INTERNATIONAL JOURNAL OF MATERIALS AND MANUFACTURING, 2018, 11 (04) : 285 - 292
  • [50] On measuring the hospital cost/quality trade-off
    Carey, K
    Burgess, JF
    HEALTH ECONOMICS, 1999, 8 (06) : 509 - 520