共 50 条
- [22] Railway Timetabling Based on Cost-Benefit Analysis 19TH EURO WORKING GROUP ON TRANSPORTATION MEETING (EWGT2016), 2017, 22 : 345 - 354
- [25] A Cost Benefit Analysis Based Approach on Soil and Water Conservation-A Case Study of the Yanhe Project PROCEEDING OF THE 5TH INTERNATIONAL YELLOW RIVER FORUM ON ENSURING WATER RIGHT OF THE RIVER'S DEMAND AND HEALTHY RIVER BASIN MAINTENANCE, VOL I, 2015, : 130 - 139
- [26] SOCIETAL COST-BENEFIT ANALYSIS OF THE SOIL REMEDIATION OPERATION IN THE NETHERLANDS CONSOIL 2008: THEME A - POLICIES ON SOIL-WATER SYSTEMS, 2008, : 134 - +