Branch-and-price approach for the multi-skill project scheduling problem

被引:0
|
作者
Carlos Montoya
Odile Bellenguez-Morineau
Eric Pinson
David Rivreau
机构
[1] Universidad de los Andes,PYLO Research Group, Department of Industrial Engineering
[2] LUNAM Université,undefined
[3] Ecole des Mines de Nantes,undefined
[4] IRCCyN,undefined
[5] LUNAM Université,undefined
[6] Université Catholique de l’Ouest,undefined
来源
Optimization Letters | 2014年 / 8卷
关键词
Branch-and-price; Column generation; Project scheduling; Multi-skilled resources;
D O I
暂无
中图分类号
学科分类号
摘要
This work introduces a procedure to solve the multi-skill project scheduling problem (MSPSP) (Néron and Baptista, International symposium on combinatorial, optimization (CO’2002), 2002). The MSPSP mixes both the classical resource constrained project scheduling problem and the multi-purpose machine model. The aim is to find a schedule that minimizes the completion time (makespan) of a project, composed of a set of activities. In addition, precedence relations and resources constraints are considered. In this problem, resources are staff members that master several skills. Thus, a given number of workers must be assigned to perform each skill required by an activity. Practical applications include the construction of buildings, as well as production and software development planning. We present a column generation approach embedded within a branch-and-price (B&P) procedure that considers a given activity and time-based decomposition approach. Obtained results show that the proposed B&P procedure is able to reach optimal solutions for several small and medium sized instances in an acceptable computational time. Furthermore, some previously open instances were optimally solved.
引用
收藏
页码:1721 / 1734
页数:13
相关论文
共 50 条
  • [31] Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem
    Maenhout, Broos
    Vanhoucke, Mario
    JOURNAL OF SCHEDULING, 2010, 13 (01) : 77 - 93
  • [32] A branch-and-price algorithm for a hierarchical crew scheduling problem
    Faneyte, DBC
    Spieksma, FCR
    Woeginger, GJ
    NAVAL RESEARCH LOGISTICS, 2002, 49 (08) : 743 - 759
  • [33] Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem
    Broos Maenhout
    Mario Vanhoucke
    Journal of Scheduling, 2010, 13 : 77 - 93
  • [34] A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency
    Zhu, Chong
    Xue, Yuan
    He, Zhijie
    Bao, Zhenqiang
    Zhang, Zhaoyue
    Hu, Kaixuan
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 719 - 724
  • [35] On the Multi-mode, Multi-skill Resource Constrained Project Scheduling Problem - A Software Application
    Santos, Monica A.
    Tereso, Anabela P.
    SOFT COMPUTING IN INDUSTRIAL APPLICATIONS, 2011, 96 : 239 - 248
  • [36] A branch-and-price approach for the partition coloring problem
    Hoshino, Edna A.
    Frota, Yuri A.
    de Souza, Cid C.
    OPERATIONS RESEARCH LETTERS, 2011, 39 (02) : 132 - 137
  • [37] A branch-and-price approach for integrating nurse and surgery scheduling
    Belien, Jeroen
    Demeulemeester, Erik
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 652 - 668
  • [38] Priority-based heuristics for the multi-skill resource constrained project scheduling problem
    Almeida, Bernardo F.
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 57 : 91 - 103
  • [39] An improved MIP-based approach for a multi-skill workforce scheduling problem
    Firat, Murat
    Hurkens, C. A. J.
    JOURNAL OF SCHEDULING, 2012, 15 (03) : 363 - 380
  • [40] The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 230 - 238