An improved MIP-based approach for a multi-skill workforce scheduling problem

被引:99
|
作者
Firat, Murat [1 ]
Hurkens, C. A. J. [1 ]
机构
[1] TU Eindhoven, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
关键词
Project scheduling; Multi-skill workforce scheduling; Mixed integer programming; STAFF; SELECTION; PROJECTS;
D O I
10.1007/s10951-011-0245-x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with scheduling complex tasks with an inhomogeneous set of resources. The problem is to assign technicians to tasks with multi-level skill requirements. Here, the requirements are merely the presence of a set of technicians that possess the necessary capabilities. An additional complication is that a set of combined technicians stays together for the duration of a work day. This typically applies to scheduling of maintenance and installation operations. We build schedules by repeated application of a flexible matching model that selects tasks to be processed and forms groups of technicians assigned to combinations of tasks. The underlying mixed integer programming (MIP) model is capable of revising technician-task allocations and performs very well, especially in the case of rare skills.
引用
收藏
页码:363 / 380
页数:18
相关论文
共 50 条
  • [1] An improved MIP-based approach for a multi-skill workforce scheduling problem
    Murat Fırat
    C. A. J. Hurkens
    Journal of Scheduling, 2012, 15 : 363 - 380
  • [2] Column generation based approaches for a tour scheduling problem with a multi-skill heterogeneous workforce
    Gerard, Matthieu
    Clautiaux, Francois
    Sadykov, Ruslan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (03) : 1019 - 1030
  • [3] Satisfaction-driven bi-objective multi-skill workforce scheduling problem
    Liu, Ming
    Liu, Xin
    IFAC PAPERSONLINE, 2019, 52 (13): : 229 - 234
  • [4] Branch-and-price approach for the multi-skill project scheduling problem
    Carlos Montoya
    Odile Bellenguez-Morineau
    Eric Pinson
    David Rivreau
    Optimization Letters, 2014, 8 : 1721 - 1734
  • [5] An integrated solution approach for multi-objective, multi-skill workforce scheduling and routing problems
    Cakirgil, Seray
    Yucel, Eda
    Kuyzu, Gultekin
    COMPUTERS & OPERATIONS RESEARCH, 2020, 118
  • [6] Branch-and-price approach for the multi-skill project scheduling problem
    Montoya, Carlos
    Bellenguez-Morineau, Odile
    Pinson, Eric
    Rivreau, David
    OPTIMIZATION LETTERS, 2014, 8 (05) : 1721 - 1734
  • [7] Lower bounds for a multi-skill project scheduling problem
    Dhib, Cheikh
    Kooli, Anis
    Soukhal, Ameur
    Neron, Emmanuel
    OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 471 - 476
  • [8] Methods to solve multi-skill project scheduling problem
    Bellenguez-Morineau, Odile
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (01): : 85 - 88
  • [9] A note on "branch-and-price approach for the multi-skill project scheduling problem"
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    OPTIMIZATION LETTERS, 2015, 9 (06) : 1255 - 1258
  • [10] A note on “branch-and-price approach for the multi-skill project scheduling problem”
    Isabel Correia
    Francisco Saldanha-da-Gama
    Optimization Letters, 2015, 9 : 1255 - 1258