共 50 条
- [41] P-time Petri nets and the hoist scheduling problem 1998 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5, 1998, : 558 - 563
- [42] A practical algorithm for cyclic hoist scheduling in a PCB manufacturing facility JOURNAL OF ELECTRONICS MANUFACTURING, 1998, 8 (3-4): : 193 - 207
- [45] A branch and bound algorithm for hoist scheduling of a circuit board production line INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1996, 8 (01): : 45 - 65
- [46] Optimal Cyclic Multiple Hoist Scheduling for Processes with Loops and Parallel Resources 2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 287 - 292
- [48] Cyclic hoist scheduling in large real-life electroplating lines OR Spectrum, 2007, 29 : 445 - 470