A Classification for Hoist Scheduling Problems

被引:0
|
作者
Marie-Ange Manier
Christelle Bloch
机构
[1] University of Technology of Belfort-Montbéliard,
来源
International Journal of Flexible Manufacturing Systems | 2003年 / 15卷
关键词
electroplating line; hoist scheduling problem; typology;
D O I
暂无
中图分类号
学科分类号
摘要
Electroplating lines are totally automated manufacturing systems that are used to cover parts with a coat of metal. They consist of a set of tanks between which the parts to be treated are transported by one or several hoists. Scheduling the movements of these hoists is commonly called a hoist scheduling problem (HSP) in the literature. But the assumptions and constraints that must be taken into account greatly depend on the production environment (physical system, manufacturing specifications, and management policies). Consequently, there exist several classes of HSPs. The systematic frameworks usually used to classify deterministic scheduling problems do not allow distinguishing between these various kinds of HSPs. Therefore, identifying the scope of each published work and comparing the various proposed scheduling methods turn out to be difficult. Thus, this article presents notation for scheduling problems in electroplating systems, to make the specification of problem types and the identification of studied problem instances easier. An associated typology gives a survey of the literature and demonstrates the usefulness of the proposed classification scheme.
引用
收藏
页码:37 / 55
页数:18
相关论文
共 50 条
  • [21] Robust optimization for the cyclic hoist scheduling problem
    Che, Ada
    Feng, Jianguang
    Chen, Haoxun
    Chu, Chengbin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (03) : 627 - 636
  • [22] Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)
    Fleury, G
    Gourgand, M
    Lacomme, P
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (15) : 3419 - 3457
  • [23] Multicyclic hoist scheduling with constant processing times
    Che, A
    Chu, CB
    Chu, F
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2002, 18 (01): : 69 - 80
  • [24] Cyclic scheduling of a hoist with time window constraints
    Chen, HX
    Chu, CB
    Proth, JM
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1998, 14 (01): : 144 - 152
  • [25] An efficient new heuristic for the hoist scheduling problem
    El Amraoui, Adnen
    Elhafsi, Mohsen
    COMPUTERS & OPERATIONS RESEARCH, 2016, 67 : 184 - 192
  • [26] Electroplating production scheduling by cyclogram unfolding in dynamic hoist scheduling problem
    Kujawski, K.
    Swiatek, J.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (17) : 5355 - 5371
  • [27] A heuristic algorithm for the two-hoist cyclic scheduling problem with overlapping hoist coverage ranges
    Zhou, Zhili
    Liu, Jiyin
    IIE TRANSACTIONS, 2008, 40 (08) : 782 - 794
  • [28] Scheduling problems under learning effects: classification and cartography
    Azzouz, Ameni
    Ennigrou, Meriem
    Ben Said, Lamjed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (04) : 1642 - 1661
  • [29] A CLASSIFICATION SCHEME FOR VEHICLE-ROUTING AND SCHEDULING PROBLEMS
    DESROCHERS, M
    LENSTRA, JK
    SAVELSBERGH, MWP
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 46 (03) : 322 - 332
  • [30] Simultaneous lotsizing and scheduling problems: a classification and review of models
    Karina Copil
    Martin Wörbelauer
    Herbert Meyr
    Horst Tempelmeier
    OR Spectrum, 2017, 39 : 1 - 64