A Classification for Hoist Scheduling Problems

被引:0
|
作者
Marie-Ange Manier
Christelle Bloch
机构
[1] University of Technology of Belfort-Montbéliard,
来源
International Journal of Flexible Manufacturing Systems | 2003年 / 15卷
关键词
electroplating line; hoist scheduling problem; typology;
D O I
暂无
中图分类号
学科分类号
摘要
Electroplating lines are totally automated manufacturing systems that are used to cover parts with a coat of metal. They consist of a set of tanks between which the parts to be treated are transported by one or several hoists. Scheduling the movements of these hoists is commonly called a hoist scheduling problem (HSP) in the literature. But the assumptions and constraints that must be taken into account greatly depend on the production environment (physical system, manufacturing specifications, and management policies). Consequently, there exist several classes of HSPs. The systematic frameworks usually used to classify deterministic scheduling problems do not allow distinguishing between these various kinds of HSPs. Therefore, identifying the scope of each published work and comparing the various proposed scheduling methods turn out to be difficult. Thus, this article presents notation for scheduling problems in electroplating systems, to make the specification of problem types and the identification of studied problem instances easier. An associated typology gives a survey of the literature and demonstrates the usefulness of the proposed classification scheme.
引用
收藏
页码:37 / 55
页数:18
相关论文
共 50 条
  • [1] A classification for hoist scheduling problems
    Manier, MA
    Bloch, C
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2003, 15 (01): : 37 - 55
  • [2] AN ALGORITHM FOR HOIST SCHEDULING PROBLEMS
    YIH, Y
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (03) : 501 - 516
  • [3] Heuristics for predictive hoist scheduling problems
    Zhang, Qiao
    Manier, Herve
    Manier, Marie-Ange
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2014, 8 (05) : 695 - 715
  • [4] A generic model and hybrid algorithm for Hoist Scheduling Problems
    Rodosek, R
    Wallace, M
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING - CP98, 1998, 1520 : 385 - 399
  • [5] Predicting the Optimal Period for Cyclic Hoist Scheduling Problems
    Efthymiou, Nikolaos
    Yorke-Smith, Neil
    INTEGRATION OF CONSTRAINT PROGRAMMING, ARTIFICIAL INTELLIGENCE, AND OPERATIONS RESEARCH, CPAIOR 2023, 2023, 13884 : 238 - 253
  • [6] Handling soft constraints in hoist scheduling problems: the fuzzy approach
    Fargier, H
    Lamothe, J
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2001, 14 (03) : 387 - 399
  • [7] Hybrid MILP/Simulation/Heuristic Algorithms to Complex Hoist Scheduling Problems
    Basan, Natalia P.
    Mendez, Carlos A.
    26TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT B, 2016, 38B : 1929 - 1934
  • [8] Combining simulated annealing with local search in multiple hoist scheduling problems
    Yang, GW
    Lam, K
    PROCEEDINGS OF '97 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 1997, : 187 - 191
  • [9] The classification of FMS scheduling problems
    Liu, J
    MacCarthy, BL
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (03) : 647 - 656
  • [10] Simulation of an underground hoist with scheduling
    Booth, D
    Szymanski, J
    MINING IN THE NEW MILLENNIUM CHALLENGES AND OPPORTUNITIES, 2000, : 291 - 300