Beamline optimization for 100keV diagnostic neutral beam (DNB) injector for ITER

被引:0
|
作者
Bandyopadhyay, M. [1 ]
Singh, M. J. [1 ]
Rotti, C. [1 ]
Chakraborty, A. [1 ]
Hemsworth, R. [2 ]
Schunke, B. [2 ]
机构
[1] Inst Plasma Res, ITER India, Gandhinagar 382428, Gujarat, India
[2] ITER IO, F-13108 St Paul Les Durance, France
关键词
ITER; neutral beam; beamline components; diagnostic; beam transmission;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The 100 kV negative hydrogen ion source based Diagnostic Neutral Beam (DNB) injector, which forms a part of the IN Procurement Package for ITER, targets a delivery of similar to 18-20A of neutral hydrogen atom beam current into the ITER torus for charge exchange resonance spectroscopy (CXRS) diagnostics. Considering stripping losses, similar to 70A negative ion current is required to be extracted from the ion source, which leads to a production of 60 A of accelerated ion beam. Subsequent process of neutralization, electrostatic ion separation and transport to the duct leads to a large separation between the points of generation of ion beam to the point of delivery of the neutral beam into the Torus (similar to 23 m). This forms one of the most important constraints for the transport of neutral beams to ITER. The requirements are not only for a stringent control over ion optics, the transport to electrostatic separator, minimum loss of beam due to intercepting elements, low reionization loss, focusing to control interception losses, adequate compensation of residual magnetic fields to overcome magnetic field induced deflections also forms important design issues for a reasonable transmission efficiency. Due to the multi parameter dependence, it becomes necessary to assess different scenarios using numerical codes. In the present case the assessment has been carried out for the DNB using the beam transport codes PDP, BTR and the MCGF codes which are developed by the Russian Federation. An optimized configuration of the beam line has been arrived at on the basis of these codes enabled studies. These parameters are: listing of the vertical and horizontal focal lengths as 20.6 m, a spacing between ground grid and neutralizer of 1 m, positioning of RID at a distance of 0.75 m from the neutraliser exit. Further, optimizing the gas feed to the source and neutralizer lead to a final transmission of similar to 35% of the extracted beam power to the torus. The paper shall present the methodology, the issues concerned and the final configuration which forms the basis for the present engineering.
引用
收藏
页码:150 / +
页数:2
相关论文
共 50 条
  • [41] In-vacuum sensors for the beamline components of the ITER neutral beam test facility
    Dalla Palma, M.
    Pasqualotto, R.
    Sartori, E.
    Spagnolo, S.
    Spolaore, M.
    Veltri, P.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2016, 87 (11):
  • [42] Beam Optics Analysis for the 120-keV Multiaperture Accelerator of Neutral Beam Injector
    Chen, Yuqian
    Liu, Longbin
    Xie, Yahong
    Wei, Jianglong
    Gu, Yuming
    Deng, Wen
    Wang, Fang
    Yang, Lixin
    Hu, Chundong
    FUSION SCIENCE AND TECHNOLOGY, 2025, 81 (03) : 269 - 278
  • [43] Diagnostic Neutral Beam for ITER-Concept to Engineering
    Chakraborty, Arun
    Rotti, Chandramouli
    Bandyopadhyay, Mainak
    Singh, M. J.
    Nair, Roopesh Gangadharan
    Shah, Sejal
    Baruah, U. K.
    Hemsworth, Ronald Stephen
    Schunke, Beatrix
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2010, 38 (03) : 248 - 253
  • [44] Vacuum Insulation and Achievement of 980 keV, 185 A/m2 H- Ion Beam Acceleration at JAEA for the ITER Neutral Beam Injector
    Tobari, Hiroyuki
    Taniguchi, Masaki
    Kashiwagi, Mieko
    Dairaku, Masayuki
    Umeda, Naotaka
    Yamanaka, Haruhiko
    Tsuchida, Kazuki
    Takemoto, Jumpei
    Watanabe, Kazuhiro
    Inoue, Takashi
    Sakamoto, Keishi
    PLASMA SCIENCE & TECHNOLOGY, 2013, 15 (02) : 179 - 183
  • [45] Conceptual design and integration of a diagnostic neutral beam in ITER
    Di Pietro, E
    Costley, A
    Inoue, T
    Krylov, A
    Panasenkov, A
    Utin, Y
    Vayakis, G
    Von Hellerman, M
    Yamada, M
    FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 929 - 934
  • [46] Commissioning of the 100 keV beam stage of the injector linac of the IFUSP microtron
    Silva, T. F.
    Malafronte, A. A.
    Bonini, A. L.
    Lima, R. R.
    Martins, M. N.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 1954 - 1956
  • [47] An Alternative Voltage Ripple Control Strategy for the AGPS of the ITER Neutral Beam Injector
    Zhang, Ming
    Zhang, Xueliang
    Xia, Linglong
    Ma, Shaoxiang
    Wang, Chuliang
    Zhuang, Ge
    Pan, Yuan
    Yu, Kexun
    JOURNAL OF FUSION ENERGY, 2015, 34 (06) : 1497 - 1503
  • [48] The insulation structure of the 1 MV transmission line for the ITER neutral beam injector
    De Lorenzi, A.
    Grando, L.
    Gobbo, R.
    Pesavento, G.
    Bettini, P.
    Specogna, R.
    Trevisan, F.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 836 - 844
  • [49] Protections against grid breakdowns in the ITER neutral beam injector power supplies
    Bigi, M.
    Toigo, V.
    Zanotto, L.
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 905 - 911
  • [50] Voltage holding study of 1 MeV accelerator for ITER neutral beam injector
    Taniguchi, M.
    Kashiwagi, M.
    Umeda, N.
    Dairaku, M.
    Takemoto, J.
    Tobari, H.
    Tsuchida, K.
    Yamanaka, H.
    Watanabe, K.
    Kojima, A.
    Hanada, M.
    Sakamoto, K.
    Inoue, T.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2012, 83 (02):