Safety Risk Assessment Using a BP Neural Network of High Cutting Slope Construction in High-Speed Railway

被引:12
|
作者
Huang, Jianling [1 ]
Zeng, Xiaoye [1 ]
Fu, Jing [2 ]
Han, Yang [1 ]
Chen, Huihua [1 ]
机构
[1] Cent South Univ, Sch Civil Engn, Dept Engn Management, Changsha 410083, Peoples R China
[2] Org Dept CPC Loudi Municipal, Loudi 417000, Peoples R China
基金
国家重点研发计划;
关键词
high cutting slope; risk assessment; BP neural network; STABILITY ANALYSIS; LANDSLIDE; DEFORMATION; MODEL;
D O I
10.3390/buildings12050598
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
High-speed railway construction is extending to mountainous areas, and the harsh environment and complex climate pose various risks to the slope construction. This seriously threatens human lives and causes huge economic losses. The existing research results on the construction safety risks of high cutting slope construction in HSRs are limited, and a complete set of safety risk assessment processes and methods has not yet been formed. Therefore, in this study, we aimed to develop a safety risk assessment model, including factor identification and classification and assessment data processing, to help project managers evaluate safety risks in high cutting slope construction. In this study, comprehensive identification of high cutting slope construction safety risks was carried out from three dimensions, risk technical specification, literature analysis, and case statistical analysis, and a list of risk-influencing factors was formed. Based on the historical data, a high side slope risk evaluation model was established using a BP neural network algorithm. The model was applied to the risk evaluation of HF high cutting slopes. The results show that the risk evaluation level is II; the main risks are earthwork excavation method, scaffolding equipment, slope height, slope rate, groundwater, personnel safety awareness, and construction safety risk management system. Finally, a case study was used to verify the proposed model, and control measures for safety risks were proposed. Our findings will help conduct effective safety management, add to the knowledge of construction safety risk management in terms of implementation, and offer lessons and references for future construction safety management of HSR.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] Safety Risk Assessment and Dynamic Deformation Control Techniques for a High-Speed Railway Bridge with an Underpass Below
    Sun, Zong-Lei
    Meng, Fan-Zeng
    Bridge Construction, 2022, 52 (05) : 135 - 141
  • [22] Information management model of construction schedule risk of high-speed railway project
    Liu, Weiqing
    Chen, Tingru
    Wei, Wanbing
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 426 - 430
  • [23] Handover algorithm for a high-speed railway based on the LSTM recurrent neural network
    Chen Y.
    Niu K.
    Kang J.
    Xi'an Dianzi Keji Daxue Xuebao/Journal of Xidian University, 2023, 50 (01): : 76 - 92
  • [24] Fault Diagnosis of High-Speed Railway Turnout Based on Convolutional Neural Network
    Zhang, Peng
    Zhang, Guohua
    Dong, Wei
    Sun, Xinya
    Ji, Xingquan
    2018 24TH IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND COMPUTING (ICAC' 18), 2018, : 719 - 724
  • [25] Intelligent Train Dispatching for High-speed Railway Based on Fuzzy Neural Network
    Sun Jingdong
    Wang Shunli
    2ND IEEE INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER CONTROL (ICACC 2010), VOL. 4, 2010, : 222 - 225
  • [26] An Identification Method of High-speed Railway Sign Based on Convolutional Neural Network
    Meng L.
    Sun X.-Y.
    Zhao B.
    Li N.
    1600, Science Press (46): : 518 - 530
  • [27] Electromagnetic Environment Assessment and Safety Research of Electrified High-Speed Railway Carriages
    Shi, Lei
    Liang, Junyi
    Liu, Yazhi
    Zhao, Yuanyuan
    Li, Xinran
    ELECTRONICS, 2024, 13 (04)
  • [28] Automated Girder Rotation Assessment of High-Speed Railway Bridges for Operation Safety
    Zheng, Han-Wen
    Yi, Ting-Hua
    Zheng, Xu
    Wei, Yun-Tao
    Yang, Dong-Hui
    Liu, Hua
    JOURNAL OF BRIDGE ENGINEERING, 2025, 30 (03)
  • [29] Construction work on the Narita new high-speed railway
    Matsuhashi, Sadao
    Japanese Railway Engineering, 2008, (160): : 9 - 11
  • [30] Propagation measurements and analysis for high-speed railway cutting scenario
    He, R.
    Zhong, Z.
    Ai, B.
    Ding, J.
    ELECTRONICS LETTERS, 2011, 47 (21) : 1167 - 1168