共 50 条
- [31] STUDY ON RISK EVALUATION MODEL OF PPP PROJECT BASED ON VAGUE VALUE PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 361 - 369
- [32] The Project Risk Assessment Model Based on the Vague and Comprehensive Evaluation Assessing EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2880 - 2885
- [33] Research of project evaluation and decision method based on gray theory PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2005, VOLS 1 AND 2, 2005, : 1630 - 1634
- [34] Research on Project Risk Evaluation Method Based on Markov Process 2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5293 - 5296
- [35] Fuzzy method for safety evaluation of construction project PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 229 - 233
- [36] Research of the Post Evaluation model for the Productivity Construction Project of Oilfield Based on the AHP INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2014, 14 (10): : 1 - 4
- [37] Research on Contractor Evaluation and Selection Model Based on Construction Project Partnering Mode 2015 4th International Conference on Social Sciences and Society (ICSSS 2015), Pt 3, 2015, 72 : 56 - 61
- [38] Engineering Project Risk Evaluation System Construction and Research Based on BP Model FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 2050 - +
- [39] Research on Comprehensive Bid Evaluation of Construction Project Based on the Principal Component Analysis 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 5412 - 5416
- [40] Tender Evaluation Method about Bidding of Construction Based on Set Pair Analysis Proceedings of the 2016 6th International Conference on Applied Science, Engineering and Technology (ICASET), 2016, 77 : 331 - 334