Research of the Evaluation Method of Construction Project Based on Vague Set

被引:0
|
作者
Pang, Nansheng [1 ]
Lin, Yifei [1 ]
机构
[1] N China Elect Power Univ, Coll Business Management, Beijing, Peoples R China
关键词
construction project evaluation; euclidean distance; Vague sets; similarity measures; MODEL;
D O I
10.1109/ICIII.2009.82
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Based on the Vague set theory of fuzzy math, this paper uses improved Vague set similarity measure methods, taking into account the three-dimensional meaning of membership degree and the influence of uncertainty membership on positive and negative subjection degree to complete and comprehend fuzzy information, such as the approving degree, opposition degree and uncertainty degree and determining the similarity measure through the expression of Euclidean distance and the weight in accordance with the requirements of the bidder, and calculates the similarity measure of different Vague set of each bidding unit's scheme, that is the approaching degree between tender program and the expected program. The greater the similarity measure is, the better of the tender program closing to the expected one. And then different programs based on the Vague set similarity measure are sorted and compared. The essence of this decision-making method is a kind of pattern recognition methods. It can provide a more rational decision-making method with stronger resolution for the construction projects evaluation and get satisfactory results of the program evaluation.
引用
收藏
页码:312 / 315
页数:4
相关论文
共 50 条
  • [31] STUDY ON RISK EVALUATION MODEL OF PPP PROJECT BASED ON VAGUE VALUE
    Hu, Li
    Zhang, Weiguo
    Lou, Tingting
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 361 - 369
  • [32] The Project Risk Assessment Model Based on the Vague and Comprehensive Evaluation Assessing
    Zhang, Jun
    EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2880 - 2885
  • [33] Research of project evaluation and decision method based on gray theory
    Chen, YB
    Liu, WL
    Zhang, L
    Zhou, YL
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2005, VOLS 1 AND 2, 2005, : 1630 - 1634
  • [34] Research on Project Risk Evaluation Method Based on Markov Process
    Sun, Anli
    Li, Cunbin
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5293 - 5296
  • [35] Fuzzy method for safety evaluation of construction project
    Yao Jinbao
    Xia He
    Zhan Jiawang
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 6, PTS A AND B, 2006, 6 : 229 - 233
  • [36] Research of the Post Evaluation model for the Productivity Construction Project of Oilfield Based on the AHP
    Du, Ruishan
    Li, Yang
    Tian, Feng
    Xie, Hongtao
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2014, 14 (10): : 1 - 4
  • [37] Research on Contractor Evaluation and Selection Model Based on Construction Project Partnering Mode
    Feng, Zhuo
    Wang, Pei
    An, Gang
    2015 4th International Conference on Social Sciences and Society (ICSSS 2015), Pt 3, 2015, 72 : 56 - 61
  • [38] Engineering Project Risk Evaluation System Construction and Research Based on BP Model
    Zhang Jianwei
    Ye Donglu
    Ye Guanchan
    Zhou Jingzhi
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 2050 - +
  • [39] Research on Comprehensive Bid Evaluation of Construction Project Based on the Principal Component Analysis
    Pang, Nansheng
    Shi, Yingling
    Ji, Changming
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 5412 - 5416
  • [40] Tender Evaluation Method about Bidding of Construction Based on Set Pair Analysis
    Wang, Jing
    Su, Wei
    Proceedings of the 2016 6th International Conference on Applied Science, Engineering and Technology (ICASET), 2016, 77 : 331 - 334