STUDY ON RISK EVALUATION MODEL OF PPP PROJECT BASED ON VAGUE VALUE

被引:0
|
作者
Hu, Li [1 ]
Zhang, Weiguo [1 ]
Lou, Tingting [2 ]
机构
[1] Chongqing Univ, Sch Econ & Business Adm, Chongqing 400030, Peoples R China
[2] Chongqing Univ, Sch Construct Management & Real Estate, Chongqing 400030, Peoples R China
关键词
Public private partnerships; risk source; risk evaluation;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Aimed at the puzzle of possibly faced great risk resulted in public-private partnerships project that is large in construction scale, long in period of project implementation, huge in investment, complex in contract relation, more in uncertainty factor, the paper proposed a sort of risk evaluation model of public-private partnerships (PPP) project based on vague value so as to that it can correctly recognize the risk, evaluate the risk objectively and reasonably, and guide rationally to resolve the problems of risk share and benefit assignment of PPP project. In the paper, it analyzed the source of probably faced risk, pointed out the risk type, adopted the risk evaluation method based on vague value from the angle of system theory, and carried through the detailed analysis for each kind of the faced risk existed in the PPP project from two aspects of the quantitative and qualitative. Finally it took to intend building a big bridge of across sea as an example in a certain city, and made the digital simulation analysis under the condition by means of PPP pattern. The result shows that it owns the feasibility and effectiveness to adopt risk evaluation model of PPP project based on vague value for making risk evaluation of true project.
引用
收藏
页码:361 / 369
页数:9
相关论文
共 50 条
  • [1] The Project Risk Assessment Model Based on the Vague and Comprehensive Evaluation Assessing
    Zhang, Jun
    EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2880 - 2885
  • [2] Study on the Risk Evaluation Model of Utility Tunnel Project under a PPP Mode
    Wang, Weiming
    Fang, Jun
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 371 - 381
  • [3] Risk and Income Evaluation Decision Model of PPP Project Based on Fuzzy Borda Method
    Du, Longbo
    Gao, Jing
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [4] Chartered Operating Model of PPP Project Based on Risk Allocation
    Yan Bin
    Wang Zhuofu
    2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 4, 2011, 4 : 224 - 228
  • [5] Electric Power Project Risk Evaluation Analysis in Grey Level Vague CIM Model
    Wu, Qunli
    Yu, Lu
    Wang, Minghao
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION REFORM AND MODERN MANAGEMENT (ERMM 2015), 2015, 15 : 330 - 333
  • [6] The Risk Evaluation of Beautiful Village Construction Project Based on PPP Mode
    Wu, Chunhong
    Fang, Jun
    Wang, Chao
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 119 - 130
  • [7] Risk Analysis of Affordable Housing Project Based on PPP Financing Model
    Cheng, Xiaoye
    Cai, Wenwen
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 508 - 512
  • [8] Study on Investment Value under Government Guarantee in PPP Project Based on OnlineSimulation
    Dong, Runrun
    Huang, Hairong
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 601 - 606
  • [9] Risk evaluation of infrastructure PPP project in construction stage based on GA-BPNN model from the psychological perspective of project managers
    Luo, Zemin
    Duan, Fei
    Ma, Jingpei
    INTERNATIONAL JOURNAL OF MENTAL HEALTH NURSING, 2024, 33 : 31 - 31
  • [10] The Construction Project PPP Risk Distribution Study
    Yang Chenhui
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON MODERN MANAGEMENT, EDUCATION TECHNOLOGY, AND SOCIAL SCIENCE (MMETSS 2016), 2016, 91 : 68 - 70