共 50 条
- [31] Power project financing risk assessment with AHP-grey vague CIM model Journal of Information and Computational Science, 2015, 12 (10): : 3953 - 3959
- [32] Study on the Early Warning of PPP Project Risk based on Rough Set and BP Neural Network PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 1479 - 1485
- [34] An Evaluation Model with Effect of Rewards and Penalties Based on Vague Sets 2014 SEVENTH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID 2014), VOL 1, 2014, : 104 - 107
- [35] The Paradox of Value for Money Assessment of PPP Project PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND INNOVATIVE EDUCATION (MSIE 2015), 2015, 32 : 138 - 142
- [37] The PPP Project Renegotiation Analysis Based on the Asymmetric Game Model 2017 4TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ECONOMICS SYSTEM AND INDUSTRIAL SECURITY ENGINEERING (IEIS), 2017,
- [38] Project Supervision Model of PPP Based on the Effect of the Market Mechanism PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 450 - 457
- [39] Research on risk evaluation model of project financing based on neural network PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 1072 - 1076
- [40] AN IT PROJECT RISK EVALUATION MODEL BASED ON BP NEURAL NETWORKS AND FUZZY SYNTHETIC EVALUATION PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2475 - 2479