STUDY ON RISK EVALUATION MODEL OF PPP PROJECT BASED ON VAGUE VALUE

被引:0
|
作者
Hu, Li [1 ]
Zhang, Weiguo [1 ]
Lou, Tingting [2 ]
机构
[1] Chongqing Univ, Sch Econ & Business Adm, Chongqing 400030, Peoples R China
[2] Chongqing Univ, Sch Construct Management & Real Estate, Chongqing 400030, Peoples R China
关键词
Public private partnerships; risk source; risk evaluation;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Aimed at the puzzle of possibly faced great risk resulted in public-private partnerships project that is large in construction scale, long in period of project implementation, huge in investment, complex in contract relation, more in uncertainty factor, the paper proposed a sort of risk evaluation model of public-private partnerships (PPP) project based on vague value so as to that it can correctly recognize the risk, evaluate the risk objectively and reasonably, and guide rationally to resolve the problems of risk share and benefit assignment of PPP project. In the paper, it analyzed the source of probably faced risk, pointed out the risk type, adopted the risk evaluation method based on vague value from the angle of system theory, and carried through the detailed analysis for each kind of the faced risk existed in the PPP project from two aspects of the quantitative and qualitative. Finally it took to intend building a big bridge of across sea as an example in a certain city, and made the digital simulation analysis under the condition by means of PPP pattern. The result shows that it owns the feasibility and effectiveness to adopt risk evaluation model of PPP project based on vague value for making risk evaluation of true project.
引用
收藏
页码:361 / 369
页数:9
相关论文
共 50 条
  • [21] Land Exploitation and Consolidation Project Evaluation Based on Vague Set Theory
    Li, Xiang Hua
    Liu, Gen Qiang
    Zhao, Yu Qian
    PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 155 - 160
  • [22] Rail Transit Project Risk Evaluation Based on AHP Model
    Zhou, Yao-Dong
    Shi, Ming-Lu
    ICIC 2009: SECOND INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTING SCIENCE, VOL 3, PROCEEDINGS: APPLIED MATHEMATICS, SYSTEM MODELLING AND CONTROL, 2009, : 236 - 238
  • [23] Using Online Simulation Technique for Revenue-Based Value for Money Assessment Model in PPP Project
    Peng, Wei
    Liu, Honglei
    INTERNATIONAL JOURNAL OF ONLINE ENGINEERING, 2013, 9 (03) : 88 - 92
  • [24] Risk transfer process in urban comprehensive corridor PPP project based on complex network model
    Yang L.
    Wang J.-J.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2020, 54 (09): : 1666 - 1676
  • [25] Intelligent Performance Evaluation of Urban Subway PPP Project Based on Deep Neural Network Model
    Fan, Weizhi
    Song, Jianmin
    Chen, Lingmin
    Shi, Junjiao
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [26] Intelligent Performance Evaluation of Urban Subway PPP Project Based on Deep Neural Network Model
    Fan, Weizhi
    Song, Jianmin
    Chen, Lingmin
    Shi, Junjiao
    Computational Intelligence and Neuroscience, 2022, 2022
  • [27] Multivariate Analysis of PPP Project Risk Based on System Dynamics
    Xu, Liangping
    Meng, Xianwei
    Cao, Yue
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 276 - 288
  • [28] Study on Qualitative Evaluation Index System of VFM in PPP Project
    Sun, Chunling
    Li, Nannan
    Zhang, Yupeng
    2019 3RD INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2019), 2019, 267
  • [29] Analyzing Project Tardiness Risk Based on Value at Risk
    Jiang, Guanjie
    Huang, Min
    Wang, Hong
    2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 1999 - 2003
  • [30] Vague Query Based on Vague Relational Model
    Zhao, Faxin
    Ma, Z. M.
    ADVANCES IN COMPUTATIONAL INTELLIGENCE, 2009, 61 : 229 - +