An Approach for Train Stop Planning With Variable Train Length and Stop Time of High-Speed Rail Under Stochastic Demand

被引:4
|
作者
Jin, Guowei [1 ]
He, Shiwei [1 ]
Li, Jiabin [1 ]
Guo, Xiaole [1 ]
Li, Yubin [1 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Transport Ind Big Data Applicat Technol C, Minist Transport, Beijing 100044, Peoples R China
来源
IEEE ACCESS | 2019年 / 7卷
基金
中国国家自然科学基金;
关键词
Column generation; Dantzig-Wolfe decomposition; high-speed rail (HSR); mathematical programming; scientific computing; stochastic demand; stop-schedule; stop time; train length; BRANCH-AND-PRICE; NETWORK DESIGN PROBLEM; DANTZIG-WOLFE DECOMPOSITION; LINEAR-PROGRAMMING APPROACH; COLUMN-GENERATION; OPTIMIZATION MODEL; ALGORITHM;
D O I
10.1109/ACCESS.2019.2940050
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper studied the train stop planning problem with variable train length and stop time under stochastic demand (TSPPWVTLSTSD). As we know, stop time and train length were often considered in a fixed manner in train stop planning for high-speed rail (HSR). One obvious disadvantage was that it often resulted in insufficient time for passengers to get on or get off a train. In addition, fixed train length may cause a waste of train capacity. And travel demand was usually assumed to be deterministic, although travel demand usually was stochastic. In this paper, we presented an optimization model that simultaneously optimized the stop-schedule, the stop time schedule and the train length schedule for each train trip under stochastic demand. By formulating deterministic equivalents to the chance constraints, we obtained a deterministic mixed integer model. To solve the problem, a novel column generation-based heuristic solution technique based on Dantzig-Wolfe decomposition principle and column generation procedure was proposed. Some numerical experiments and a case study based on real-world data were used to demonstrate that the proposed solution method can yield a service plan within a reasonable time compared with ILOG Cplex. Besides, the variable train length and stop time model needed fewer carriages and also gave rise to less total time loss compared with the fixed scenario.
引用
收藏
页码:129690 / 129708
页数:19
相关论文
共 50 条
  • [41] How to Optimize Train Stops under Diverse Passenger Demand: a New Line Planning Method for Large-Scale High-Speed Rail Networks
    Zhang, Xin
    Nie, Lei
    Wu, Xin
    Ke, Yu
    NETWORKS & SPATIAL ECONOMICS, 2020, 20 (04): : 963 - 988
  • [42] How to Optimize Train Stops under Diverse Passenger Demand: a New Line Planning Method for Large-Scale High-Speed Rail Networks
    Xin Zhang
    Lei Nie
    Xin Wu
    Yu Ke
    Networks and Spatial Economics, 2020, 20 : 963 - 988
  • [43] Stochastic Model of Train Running Time and Arrival Delay: A Case Study of Wuhan-Guangzhou High-Speed Rail
    Lessan, Javad
    Fu, Liping
    Wen, Chao
    Huang, Ping
    Jiang, Chaozhe
    TRANSPORTATION RESEARCH RECORD, 2018, 2672 (10) : 215 - 223
  • [44] CHARACTERISTICS ANALYSIS ON BEARING ROTOR SYSTEM OF HIGH-SPEED TRAIN UNDER VARIABLE SPEED CONDITIONS
    Wang, Baosen
    Liu, Yongqiang
    Lixue Xuebao/Chinese Journal of Theoretical and Applied Mechanics, 2022, 54 (07): : 1839 - 1852
  • [45] Development and stability analysis of a high-speed train bearing system under variable speed conditions
    Wang, Baosen
    Liu, Yongqiang
    Zhang, Bin
    Yang, Shaopu
    INTERNATIONAL JOURNAL OF MECHANICAL SYSTEM DYNAMICS, 2022, 2 (04): : 352 - 362
  • [46] Assessing the impacts of the high-speed train on tourism demand in China
    Yan, York Qi
    Zhang, Hanqin Qiu
    Ye, Ben Haobin
    TOURISM ECONOMICS, 2014, 20 (01) : 157 - 169
  • [47] Integrated Optimization of Stop Planning and Timetabling for Demand-Responsive Transport in High-Speed Railways
    Li, Yawei
    Han, Baoming
    Yang, Ruixia
    Zhao, Peng
    APPLIED SCIENCES-BASEL, 2023, 13 (01):
  • [48] Numerical investigation of influence of pantograph parameters and train length on aerodynamic drag of high-speed train
    Sun, Zhi-kun
    Wang, Tian-tian
    Wu, Fan
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2020, 27 (04) : 1334 - 1350
  • [49] The calculation of train slipstreams on platform of underground high-speed rail station
    Yang, Wei-Chao
    He, Chuan
    Peng, Li-Min
    MATERIALS, MECHANICAL AND MANUFACTURING ENGINEERING, 2014, 842 : 445 - +
  • [50] DESIGN AND MANUFACTURE OF THE BRITISH-RAIL HIGH-SPEED TRAIN CAB
    GOTCH, TM
    PLASTICS & RUBBER INTERNATIONAL, 1979, 4 (03): : 119 - 124