An Approach for Train Stop Planning With Variable Train Length and Stop Time of High-Speed Rail Under Stochastic Demand

被引:4
|
作者
Jin, Guowei [1 ]
He, Shiwei [1 ]
Li, Jiabin [1 ]
Guo, Xiaole [1 ]
Li, Yubin [1 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Transport Ind Big Data Applicat Technol C, Minist Transport, Beijing 100044, Peoples R China
来源
IEEE ACCESS | 2019年 / 7卷
基金
中国国家自然科学基金;
关键词
Column generation; Dantzig-Wolfe decomposition; high-speed rail (HSR); mathematical programming; scientific computing; stochastic demand; stop-schedule; stop time; train length; BRANCH-AND-PRICE; NETWORK DESIGN PROBLEM; DANTZIG-WOLFE DECOMPOSITION; LINEAR-PROGRAMMING APPROACH; COLUMN-GENERATION; OPTIMIZATION MODEL; ALGORITHM;
D O I
10.1109/ACCESS.2019.2940050
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper studied the train stop planning problem with variable train length and stop time under stochastic demand (TSPPWVTLSTSD). As we know, stop time and train length were often considered in a fixed manner in train stop planning for high-speed rail (HSR). One obvious disadvantage was that it often resulted in insufficient time for passengers to get on or get off a train. In addition, fixed train length may cause a waste of train capacity. And travel demand was usually assumed to be deterministic, although travel demand usually was stochastic. In this paper, we presented an optimization model that simultaneously optimized the stop-schedule, the stop time schedule and the train length schedule for each train trip under stochastic demand. By formulating deterministic equivalents to the chance constraints, we obtained a deterministic mixed integer model. To solve the problem, a novel column generation-based heuristic solution technique based on Dantzig-Wolfe decomposition principle and column generation procedure was proposed. Some numerical experiments and a case study based on real-world data were used to demonstrate that the proposed solution method can yield a service plan within a reasonable time compared with ILOG Cplex. Besides, the variable train length and stop time model needed fewer carriages and also gave rise to less total time loss compared with the fixed scenario.
引用
收藏
页码:129690 / 129708
页数:19
相关论文
共 50 条
  • [21] Optimization Approach for High-Speed Railway Stop Planning Based on Passing-Stop Ratio
    Li, Zhenyi
    Zhao, Shuo
    Xu, Guangming
    Wang, Wanqi
    Shan, Xinghua
    Bao, Liu
    CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 2051 - 2063
  • [22] Study on high-speed railway ticket allocation under conditions of multiple trains and multiple train stop plans
    Zhao X.
    Zhao P.
    Li B.
    Zhao, Peng (pzhao@bjtu.edu.cn), 1600, Science Press (38): : 9 - 15
  • [23] Train delay propagation under random interference on high-speed rail network
    Feng, Ziyan
    Cao, Chengxuan
    Liu, Yutong
    INTERNATIONAL JOURNAL OF MODERN PHYSICS C, 2019, 30 (08):
  • [24] Collaborative Optimization of High-speed Train Line Planning and Seat Allocation under "Daily Train Timetabling"
    Zhao X.
    Wu J.
    Shan X.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (08): : 10 - 17
  • [25] Robust optimization models for integrated train stop planning and timetabling with passenger demand uncertainty
    Cacchiani, Valentina
    Qi, Jianguo
    Yang, Lixing
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2020, 136 : 1 - 29
  • [26] Collaborative Optimization of Demand-oriented Train Timetabling and Stop Planning for Intercity Railways
    Tian X.-P.
    Niu H.-M.
    Han Y.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2023, 23 (02): : 197 - 207
  • [27] Dynamic analysis of high-speed train with stochastic parameters
    Luo, Ren
    Li, Ran
    Hu, Junbo
    Peng, Yikai
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2015, 51 (24): : 90 - 96
  • [28] Uncertain demand based integrated optimisation for train timetabling and coupling on the high-speed rail network
    Feng, Ziyan
    Cao, Chengxuan
    Mostafizi, Alireza
    Wang, Haizhong
    Chang, Ximing
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (05) : 1532 - 1555
  • [29] Demand-driven train timetabling for air and intercity high-speed rail synchronization service
    Jiang, Yangsheng
    Chen, Shuiwang
    An, Wenyao
    Hu, Lu
    Li, Yan
    Liu, Jun
    TRANSPORTATION LETTERS-THE INTERNATIONAL JOURNAL OF TRANSPORTATION RESEARCH, 2023, 15 (04): : 321 - 335
  • [30] Rail Effect on Aerodynamic Drag Characteristics of High-speed Train
    Huo Q.
    Mei Y.
    Mei, Yuangui (meiyuangui@163.com), 2018, Chinese Mechanical Engineering Society (54): : 152 - 159