Six Sigma system as a tool to Improve the company's level of success

被引:0
|
作者
Gider, Franc [1 ]
Zlabravec, Vera [2 ]
机构
[1] TIA, Ljubljana, Slovenia
[2] Prediln Litija Dd, Litija, Slovenia
来源
TEKSTIL | 2009年 / 58卷 / 09期
关键词
Six Sigma; process optimization; quality;
D O I
暂无
中图分类号
TB3 [工程材料学]; TS1 [纺织工业、染整工业];
学科分类号
0805 ; 080502 ; 0821 ;
摘要
The paper describes Six Sigma system and its application at Litija Spinning Mill. The introduction of the Six Sigma system includes training of 5 candidates as improvement project managers (Six Sigma Black Belt). In addition to training, the candidates worked on pilot improvement projects, which they successfully finished. Quantitative results of the pilot projects were higher productivity of the spinning mill by means of the systematic improvement of given process specifications (reduction of the loss of spindle-hours by 41%) and higher productivity of preliminary spinning through the improvement of planning lots (reduction of hours used per production unit by 5%). Pilot projects produced immeasurable results reflected in improving work conditions at the spinning mill and in the introduction of a new, more accurate method for quality measurement of yarn. Thanks to the successfully finished training of the project managers and the pilot projects the company obtained new insights into process optimization and quality improvement which will be applied in the future.
引用
收藏
页码:443 / 449
页数:7
相关论文
共 50 条
  • [21] Critical success factors for Six Sigma projects
    Lambert Marzagao, Daniela Santana
    Carvalho, Marly M.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (08) : 1505 - 1518
  • [22] Success with six sigma often an elusive goal
    不详
    AVIATION WEEK & SPACE TECHNOLOGY, 1998, 149 (20): : 53 - 53
  • [23] Critical Success Factors of Six Sigma: An Overview
    Tlapa, D.
    Limon, J.
    Baez, Y.
    Valles-Rosales, D. J.
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 818 - 822
  • [24] Six Sigma's Missing Link - Understanding the quality tool needed to calculate sigma ratings
    Gnibus, RJ
    QUALITY PROGRESS, 2000, 33 (11) : 77 - +
  • [25] APPLICATION OF LEAN SIX SIGMA TO IMPROVE HIGH-ITENSITY MAGNETIC SEPARATION STEP IN A MINING COMPANY
    Guimaraes, M. T. G.
    Pereira, P. E. C.
    Silva, G. G.
    Diniz-Pinto, H. S.
    Araujo, R. De P.
    HOLOS, 2021, 37 (05)
  • [26] Six Sigma methods applied in an injection moulding company
    Timans, Werner
    Ahaus, Kees
    Antony, Jiju
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2014, 5 (02) : 149 - 167
  • [27] Application of Six Sigma methodology in an Indian chemical company
    Patyal, Vishal Singh
    Modgil, Sachin
    Koilakuntla, Maddulety
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2021, 70 (02) : 350 - 375
  • [28] EVALUATION OF CRITICAL SUCCESS FACTORS EFFECT ON SIX SIGMA PROJECT SUCCESS IN TURKEY'S MANUFACTURING SECTOR
    Turkan, Yusuf Sait
    Manisali, Ekrem
    Celikkol, Mahmut Fahrettin
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2009, 27 (02): : 105 - 117
  • [29] System level design: Six success stories in search of an industry
    Bacchini, F
    Martin, G
    Paulin, P
    Bergamaschi, RA
    Pawate, R
    Bernstein, A
    Chandra, R
    Ben-Romdhane, M
    41ST DESIGN AUTOMATION CONFERENCE, PROCEEDINGS 2004, 2004, : 349 - 350
  • [30] The essential Six Sigma - How successful Six Sigma implementation can improve the bottom line
    Lucas, JM
    QUALITY PROGRESS, 2002, 35 (01) : 27 - 31